A park project does not fail at the factory – it fails at the handover points, where a drawing, a container or an installation team moves between two parties.

This is the process we follow on every overseas project, and understanding it before you sign keeps the opening date and the budget under control.

amusement park masterplan

Spesifikasi Utama

Barang Referensi
Panggung 1 Tinjauan situs dan pasar dengan klien
Panggung 2 Tata letak konsep dan perpaduan pengendaraan
Panggung 3 Kutipan, ruang lingkup dan pentahapan
Panggung 4 Pengujian produksi dan pabrik
Panggung 5 Pemuatan dan pengiriman kontainer
Panggung 6 Installation and commissioning
Panggung 7 Pelatihan, spares and after sales

Semua angka adalah nilai referensi dan dikonfirmasi dalam proposal teknik untuk situs Anda.

amusement park design rendering

Panggung 1 Dan 2: Site Review and Concept Layout

Everything begins with the plot: dimensions, soil, mengakses, kekuatan, water and local regulations. From that we produce a concept layout that places the entrance, walkways, ride zones and service areas, and we recommend a ride mix that fits the space and the target audience. Clients who invest time at this stage avoid the most expensive mistake in the industry, which is buying attractions that do not fit the site.

Panggung 3: Kutipan, Scope and Phasing

A useful quotation separates equipment from civil works, pengiriman, installation and spare parts, because those costs fall into different budgets and different years. Agree what is included at the factory gate, what the buyer arranges locally and where responsibility changes hands. Phasing the purchase so that foundations, first rides and second phase additions arrive in a logical order is normal practice, and it is far cheaper than storing equipment.

Panggung 4 Dan 5: Produksi, Testing and Shipping

Production starts against approved drawings, and every ride is assembled and tested at the factory before shipment, which is where electrical and mechanical defects should be found. Container loading is planned per ride so that parts arrive in installation sequence, and packing lists are matched to the drawings. Buyers should ask for test reports, load test records and photographs before the container doors are closed – refer to kontainerisasi standards when planning cargo.

Panggung 6 Dan 7: Instalasi, Opening and After Sales

Installation follows the sequence in the drawing set, ends with commissioning and load testing, and finishes with operator training on the actual machines rather than on a manual. Setelah dibuka, the relationship continues through spare parts, technical support and scheduled inspection guidance. A supplier such as our amusement park project team should be measured on how quickly it answers in year two, not on how fast it quoted in month one.


Apa yang Dapat Anda Sesuaikan

Kustomisasi mencakup bagian-bagian yang benar-benar diperhatikan oleh para tamu: Ruang lingkup proyek, pentahapan, delivery terms and installation support.

Hal yang sama pabrik peralatan hiburan yang membangun perjalanan juga mengirimkannya, mendokumentasikannya dan mendukungnya – 125,000 meter persegi ruang produksi dan paket dokumentasi yang dapat digunakan oleh pengawas lokal. Pekerjaan proyek meliputi gambar tata letak, daftar peralatan dan dokumentasi bertahap dapat Anda serahkan langsung ke kontraktor lokal.

Beri kami detail situs dan tenggat waktu yang Anda kerjakan – kami akan memetakan fase-fasenya, peralatan dan garis besar biayanya.