The site decision is made before the equipment decision, and it is the one that is hardest to reverse – a cheap plot in the wrong location costs more than an expensive one that works.

These are the three site models Indonesian operators choose between, and the questions that decide which one suits your project.

amusement park site plan

Основни спецификации

Елемент справка
Mall unit Footfall provided, rent high, trading hours fixed
Standalone plot Full control and parking, needs own marketing
Resort or attraction Captive audience, strong seasonal peaks
Key factors Rent, access, мощност, височина на тавана, permits
Zoning Confirm land use before signing anything
Decision test Model rent against realistic footfall

Всички цифри са референтни стойности и са потвърдени в инженерното предложение за вашия сайт.

amusement park layout design

Model One: The Mall Unit

A mall provides footfall, security, parking and air conditioning, and it is the fastest way to open an indoor attraction. In exchange you accept higher rent per square metre, fixed trading hours, limits on noise and structural changes, and a fit out that may have to be removed at the end of the lease. Mall units suit soft play, arcades, trampolines and compact family rides, all of which need ceiling height and floor loading checked before signing.

Model Two: The Standalone Plot

A standalone plot gives control: your own opening hours, your own branding, outdoor attractions and space to expand. It also means building the footfall yourself, funding parking and services, and carrying the cost of land or a long lease. Standalone sites suit non-powered parks, go kart tracks and mixed indoor and outdoor venues, and they reward operators who are prepared to market consistently rather than rely on passing traffic.

Model Three: Resort, Attraction or Destination

Attaching to an existing destination – a resort, a beach area, a scenic attraction or a large park – gives a captive audience that is already on holiday and willing to spend. The trade offs are seasonality, dependence on the host venue, and shared revenue or rent arrangements that must be modelled carefully. This model suits water play, novelty rides and themed family attractions that work as an add on to an existing visit.

The Questions That Decide

Whatever the model, the same checks decide viability: realistic footfall and spend per guest, rent or land cost against revenue, power availability, water and drainage, ceiling height and floor loading, access for deliveries and construction, and the permitted land use under local zoning rules. Equipment choices follow from those answers, не обратното – нашият Indonesia investment guide sets out how the three models translate into a first project.


Персонализиране

Опции, които можете да посочите, преди да започне производството: Site evaluation, equipment fit and phasing.

Като директен доставчик ние контролираме цялата верига: инженерство, производство, фабричните тестове и опаковането за износ се извършват вътре в a 125,000 квадратен метър производствена база, и списъкът с резервни части следва машината до вашия сайт. Работата по проекта включва чертежи на оформлението, поетапни списъци с оборудване и документация, които можете да предадете направо на местен изпълнител.

Изпратете своя парцеларен план, бюджетен диапазон и целева дата на отваряне – ние ще върнем поетапно предложение, което можете да отнесете направо до вашия съвет.