In a tropical park the equipment is rarely the problem. The heat, the rain and the drainage are.

Design for climate first and the equipment lasts longer, guests stay longer and the maintenance bill drops – which is the opposite of how most parks are planned.

shaded outdoor play area

Основни спецификации

Елемент справка
Shade coverage Prioritise the busiest play areas
Наваряване Draining surfaces such as wet pour or tiles
Drainage Falls away from play and landing zones
Материали UV stable coatings and corrosion resistant fixings
Planting Non-toxic, low shedding species
Поддръжка Monthly corrosion and surfacing checks

Всички цифри са референтни стойности и са потвърдени в инженерното предложение за вашия сайт.

outdoor play surfacing

Heat Is the Real Design Constraint

Metal slides become unusable at midday, rubber surfacing softens and families leave before lunch. Shade over the busiest play areas extends usable hours more cheaply than adding equipment, and it protects surfacing from cracking. Prioritise shade over the toddler area, the slide exits and the seating, then extend coverage as revenue allows. Equipment such as our открита неохранена детска площадка range is specified with tropical installation in mind.

Drainage and the Rainy Season

Water destroys play areas quietly: it lifts tiles, washes away loose fill and rusts fixings from below. Set the falls so that water leaves the play and landing zones rather than pooling in them, include surface drains on the low side of each zone, and design access paths to stay usable after heavy rain. A park that drains well can open within an hour of a tropical downpour.

Materials That Survive Humidity

Humidity attacks fasteners, bearings and painted steel long before it attacks structural members. Specify hot dip galvanised or stainless fixings, powder coated frames and UV stabilised plastic and UV resistant colour finishes, and avoid mixing dissimilar metals where moisture collects. Composite and aluminium components cost more at purchase and much less over ten years of tropical operation.

A Maintenance Calendar for Tropical Sites

Plan maintenance around the climate: monthly corrosion and surfacing checks during the wet season, pre season shade and netting inspection before the busy period, and a post storm walk that checks trees, fixings and drainage. Record everything, because a written log is what proves the park is looked after when an inspector or an insurer asks.


Персонализиране и адаптиране на сайта

Всичко видимо можете да определите: Shade, настилка, planting and material specifications.

Като директен доставчик ние контролираме цялата верига: инженерство, производство, фабричните тестове и опаковането за износ се извършват в производствена база от 125 000 квадратни метра, и списъкът с резервни части следва машината до вашия сайт. Работата по проекта включва чертежи на оформлението, поетапни списъци с оборудване и документация, които можете да предадете направо на местен изпълнител.

Изпратете своя парцеларен план, бюджетен диапазон и целева дата на отваряне – ние ще върнем поетапно предложение, което можете да отнесете направо до вашия съвет.