The site decision is made before the equipment decision, and it is the one that is hardest to reverse – a cheap plot in the wrong location costs more than an expensive one that works.

These are the three site models Indonesian operators choose between, and the questions that decide which one suits your project.

amusement park site plan

Wichtige Spezifikationen

Artikel Referenz
Mall-Einheit Trittfrequenz vorhanden, Miete hoch, Handelszeiten festgelegt
Eigenständiges Grundstück Volle Kontrolle und Parken, braucht eigenes Marketing
Resort oder Attraktion Fesselndes Publikum, starke saisonale Spitzen
Schlüsselfaktoren Mieten, Zugang, Leistung, Deckenhöhe, Genehmigungen
Zoneneinteilung Bestätigen Sie die Landnutzung, bevor Sie etwas unterschreiben
Decision test Model rent against realistic footfall

Alle Angaben sind Richtwerte und werden im Planungsvorschlag für Ihren Standort bestätigt.

amusement park layout design

Model One: The Mall Unit

A mall provides footfall, security, parking and air conditioning, and it is the fastest way to open an indoor attraction. In exchange you accept higher rent per square metre, fixed trading hours, limits on noise and structural changes, and a fit out that may have to be removed at the end of the lease. Mall units suit soft play, arcades, trampolines and compact family rides, all of which need ceiling height and floor loading checked before signing.

Model Two: The Standalone Plot

A standalone plot gives control: your own opening hours, your own branding, outdoor attractions and space to expand. It also means building the footfall yourself, funding parking and services, and carrying the cost of land or a long lease. Standalone sites suit non-powered parks, go kart tracks and mixed indoor and outdoor venues, and they reward operators who are prepared to market consistently rather than rely on passing traffic.

Model Three: Resort, Attraction or Destination

Attaching to an existing destination – a resort, a beach area, a scenic attraction or a large park – gives a captive audience that is already on holiday and willing to spend. The trade offs are seasonality, dependence on the host venue, and shared revenue or rent arrangements that must be modelled carefully. This model suits water play, novelty rides and themed family attractions that work as an add on to an existing visit.

The Questions That Decide

Whatever the model, the same checks decide viability: realistic footfall and spend per guest, rent or land cost against revenue, power availability, water and drainage, ceiling height and floor loading, access for deliveries and construction, and the permitted land use under local zoning rules. Equipment choices follow from those answers, nicht umgekehrt – unser Indonesia investment guide sets out how the three models translate into a first project.


Anpassung

Optionen, die Sie vor Produktionsbeginn festlegen können: Site evaluation, equipment fit and phasing.

Als direkt Anbieter Wir kontrollieren die gesamte Kette: Maschinenbau, Produktion, Werkstests und Exportverpackung finden alle innerhalb eines statt 125,000 Quadratmeter Produktionsfläche, und die Ersatzteilliste folgt der Maschine bis zu Ihrem Standort. Die Projektarbeit umfasst Layoutzeichnungen, Gestaffelte Ausrüstungslisten und Dokumentationen, die Sie direkt an einen örtlichen Auftragnehmer weitergeben können.

Senden Sie Ihren Grundstücksplan, Budgetspanne und angestrebtes Eröffnungsdatum – Wir senden Ihnen einen schrittweisen Vorschlag zurück, den Sie direkt an Ihren Vorstand weiterleiten können.