The site decision is made before the equipment decision, and it is the one that is hardest to reverse – a cheap plot in the wrong location costs more than an expensive one that works.

These are the three site models Indonesian operators choose between, and the questions that decide which one suits your project.

amusement park site plan

主な仕様

アイテム 参照
Mall unit Footfall provided, rent high, trading hours fixed
Standalone plot Full control and parking, needs own marketing
Resort or attraction Captive audience, strong seasonal peaks
Key factors Rent, アクセス, 力, 天井の高さ, permits
Zoning Confirm land use before signing anything
Decision test Model rent against realistic footfall

すべての数値は参考値であり、お客様のサイトのエンジニアリング提案で確認されます。.

amusement park layout design

Model One: The Mall Unit

A mall provides footfall, security, parking and air conditioning, and it is the fastest way to open an indoor attraction. In exchange you accept higher rent per square metre, fixed trading hours, limits on noise and structural changes, and a fit out that may have to be removed at the end of the lease. Mall units suit soft play, arcades, trampolines and compact family rides, all of which need ceiling height and floor loading checked before signing.

Model Two: The Standalone Plot

A standalone plot gives control: your own opening hours, your own branding, outdoor attractions and space to expand. It also means building the footfall yourself, funding parking and services, and carrying the cost of land or a long lease. Standalone sites suit non-powered parks, go kart tracks and mixed indoor and outdoor venues, and they reward operators who are prepared to market consistently rather than rely on passing traffic.

Model Three: Resort, Attraction or Destination

Attaching to an existing destination – a resort, a beach area, a scenic attraction or a large park – gives a captive audience that is already on holiday and willing to spend. The trade offs are seasonality, dependence on the host venue, and shared revenue or rent arrangements that must be modelled carefully. This model suits water play, novelty rides and themed family attractions that work as an add on to an existing visit.

The Questions That Decide

Whatever the model, the same checks decide viability: realistic footfall and spend per guest, rent or land cost against revenue, power availability, water and drainage, ceiling height and floor loading, access for deliveries and construction, and the permitted land use under local zoning rules. Equipment choices follow from those answers, not the other way round – 私たちの Indonesia investment guide sets out how the three models translate into a first project.


カスタマイズ

生産開始前に指定できるオプション: Site evaluation, equipment fit and phasing.

直接として サプライヤー 私たちはチェーン全体を制御します: エンジニアリング, 生産, 工場でのテストと輸出梱包はすべて室内で行われます。 125,000 平方メートルの生産拠点, スペアパーツリストは機械に続いてお客様のサイトに届きます. プロジェクト作業にはレイアウト図面が含まれます, 段階的な機器リストとドキュメントを地元の請負業者に直接渡すことができます.

プロットプランを送信してください, 予算範囲と目標開業日 – 段階的な提案を返信しますので、取締役会に直接提出してください。.