A carousel is the one attraction every generation rides, and in a market where families visit together it earns from the moment the park opens.

This project installed a 36 seat carousel as the centrepiece of a family zone, with lighting designed for evening trading as well as daytime use.

carousel platform installation

المواصفات الرئيسية

غرض مرجع
دولة Vietnam
نوع المشروع Family carousel
Contract value دولار أمريكي 65,700 class project
سعة 36 riders per cycle
نِطَاق إمداد, إرشادات الشحن والتركيب
يدعم التكليف, قائمة التدريب وقطع الغيار

جميع الأرقام هي قيم مرجعية وتم تأكيدها في الاقتراح الهندسي لموقعك. The carousel mechanism is simple and reliable, which is why the ride type lasts for decades. يرى Carousel.

carousel figures and trim

Platform Layout and Position

The carousel was placed where the main walkways meet, so it becomes the meeting point of the park and the background of most guest photographs. Boarding sits on the quiet side of the platform, and the queue lane is kept separate from the exit so loading and unloading never cross.

أرقام, Finish and Lighting

Figures and trim were specified for outdoor use with UV stable finishes, and the lighting programme was designed for the evening rather than added as decoration. Music and lighting run as one show so the ride reads as a single attraction from a distance.

Installation and Commissioning

Assembly followed the standard sequence: منصة وعمود مركزي, إطار دوار ومحرك, ثم الأرقام, تقليم والإضاءة. Commissioning covered drive, brake, restraint checks and the lighting programme, and staff training covered start-up, loading discipline and shutdown.

Maintenance and Spares

The routine covers the centre bearing, القيادة والفرامل, platform fixings and the figure and seat connections that guests touch daily. Keeping lamps, restraint parts and a set of figure fittings on site means a fault costs hours rather than a weekend – the same approach we recommend for every دائري تثبيت.


التخصيص وملاءمة الموقع

يغطي التخصيص الأجزاء التي يلاحظها الضيوف بالفعل: الألوان, سمة, أرقام, lighting and music.

كل وحدة تترك أ 125,000 مصنع متر مربع في الصين مع سجلات الاختبار, الرسومات وقائمة قطع الغيار الموصى بها, وهو ما أ شريك التصنيع ينبغي تسليمها بدلا من مجرد الفاتورة. يتضمن عمل المشروع الرسومات التخطيطية, قوائم المعدات والوثائق المرحلية التي يمكنك تسليمها مباشرة إلى مقاول محلي.

أعطنا تفاصيل الموقع والموعد النهائي الذي تعمل عليه – سنقوم بتخطيط المراحل, المعدات ومخطط التكلفة ضدها.