This project was built for a market with heavy rain and long school holidays, so the design had to keep guests comfortable in the heat and drain quickly in a storm.

The result was a non-powered park with a strong anchor slide complex, climbing and net elements, and a shaded family zone at its centre.

climbing equipment for park

المواصفات الرئيسية

غرض مرجع
دولة فيلبيني
نوع المشروع Non-powered family park
Contract value دولار أمريكي 125,000 class project
نِطَاق معدات, دعم الشحن والتركيب
مزج مجمع الشرائح, شبكات التسلق, يتأرجح, toddler area
مناخ الحرارة الاستوائية, humidity, typhoon season

جميع الأرقام هي قيم مرجعية وتم تأكيدها في الاقتراح الهندسي لموقعك. Design follows recognised playground safety principles such as في 1176.

adventure route in play park

Structures and Surfacing

The anchor slide complex carried multiple lanes so throughput stays high on holidays, with climbing towers and net elements providing a route for older children. Surfacing was installed per zone with depth recorded against the highest fall height, which matters where heavy rain can wash loose material out of position.

Drainage and Storm Planning

Falls were set so water leaves the play and landing zones rather than pooling, and access paths were designed to stay usable after a downpour. The park also keeps a simple storm routine: inspect the site after severe weather, check fixings and netting, and record anything that needs attention before reopening.

Shade and Family Comfort

Shade was installed over the busiest structures and the seating before secondary equipment was added. At this latitude the difference is measurable: families stay through the middle of the day instead of leaving at noon, which is what the operator needed to justify the investment.

Operating Model After Opening

The park runs two to four attendants plus a supervisor, with a daily inspection of structures, netting and surfacing. Entry is priced simply, and capacity is managed at the gate rather than on the equipment. The same operating logic appears in our non powered park guide.


خيارات الموضوع والانتهاء

الخيارات التي يمكنك تحديدها قبل بدء الإنتاج: تَخطِيط, mix, shade strategy and surfacing specification.

نحن نقتبس كما المباشر الشركة المصنعة للمعدات من أ 125,000 قاعدة إنتاج م², لذا فإن المحادثة الفنية والتجارية تحدث في نفس المكان, مع 20 سنوات من مشاريع التصدير وراء الجواب. يتم شحن الهياكل غير المزودة بالطاقة ببيانات ارتفاع السقوط وتوصيات السطح لكل منصة ومخرج شريحة.

أرسل خطة قطعة الأرض الخاصة بك وتفضيلات السطح – سوف نعيد تخطيطًا بارتفاعات السقوط, استراتيجية الظل وقائمة المعدات المرحلية.