In a tropical park the equipment is rarely the problem. The heat, the rain and the drainage are.
Design for climate first and the equipment lasts longer, guests stay longer and the maintenance bill drops – which is the opposite of how most parks are planned.

Spécifications clés
| Article | Référence |
|---|---|
| Shade coverage | Prioritise the busiest play areas |
| Surfaçage | Draining surfaces such as wet pour or tiles |
| Drainage | Falls away from play and landing zones |
| Matériels | UV stable coatings and corrosion resistant fixings |
| Planting | Non-toxic, low shedding species |
| Entretien | Monthly corrosion and surfacing checks |
Tous les chiffres sont des valeurs de référence et sont confirmés dans la proposition d'ingénierie de votre site.

Heat Is the Real Design Constraint
Metal slides become unusable at midday, rubber surfacing softens and families leave before lunch. Shade over the busiest play areas extends usable hours more cheaply than adding equipment, and it protects surfacing from cracking. Prioritise shade over the toddler area, the slide exits and the seating, then extend coverage as revenue allows. Equipment such as our aire de jeux extérieure non motorisée range is specified with tropical installation in mind.
Drainage and the Rainy Season
Water destroys play areas quietly: it lifts tiles, washes away loose fill and rusts fixings from below. Set the falls so that water leaves the play and landing zones rather than pooling in them, include surface drains on the low side of each zone, and design access paths to stay usable after heavy rain. A park that drains well can open within an hour of a tropical downpour.
Materials That Survive Humidity
Humidity attacks fasteners, bearings and painted steel long before it attacks structural members. Specify hot dip galvanised or stainless fixings, powder coated frames and UV stabilised plastic and UV resistant colour finishes, and avoid mixing dissimilar metals where moisture collects. Composite and aluminium components cost more at purchase and much less over ten years of tropical operation.
A Maintenance Calendar for Tropical Sites
Plan maintenance around the climate: monthly corrosion and surfacing checks during the wet season, pre season shade and netting inspection before the busy period, and a post storm walk that checks trees, fixings and drainage. Record everything, because a written log is what proves the park is looked after when an inspector or an insurer asks.
Personnalisation et ajustement du site
Tout ce qui est visible est à vous de définir: Shade, surfaçage, planting and material specifications.
En direct fournisseur nous contrôlons toute la chaîne: ingénierie, production, les tests en usine et l'emballage pour l'exportation ont tous lieu dans une base de production de 125 000 mètres carrés, et la liste des pièces détachées suit la machine jusqu'à votre site. Le travail du projet comprend des dessins d'implantation, des listes d'équipements et une documentation progressives que vous pouvez remettre directement à un entrepreneur local.
Envoyez votre plan de terrain, fourchette budgétaire et date d’ouverture cible – nous vous renverrons une proposition progressive que vous pourrez soumettre directement à votre conseil d'administration.