In a tropical park the equipment is rarely the problem. The heat, the rain and the drainage are.

Design for climate first and the equipment lasts longer, guests stay longer and the maintenance bill drops – which is the opposite of how most parks are planned.

shaded outdoor play area

Belangrijkste specificaties

Item Referentie
Shade coverage Prioritise the busiest play areas
Opduiken Draining surfaces such as wet pour or tiles
Drainage Falls away from play and landing zones
Materialen UV stable coatings and corrosion resistant fixings
Planting Non-toxic, low shedding species
Onderhoud Monthly corrosion and surfacing checks

Alle cijfers zijn referentiewaarden en worden bevestigd in het technische voorstel voor uw locatie.

outdoor play surfacing

Heat Is the Real Design Constraint

Metal slides become unusable at midday, rubber surfacing softens and families leave before lunch. Shade over the busiest play areas extends usable hours more cheaply than adding equipment, and it protects surfacing from cracking. Prioritise shade over the toddler area, the slide exits and the seating, then extend coverage as revenue allows. Equipment such as our buitenspeelplaats zonder elektriciteit range is specified with tropical installation in mind.

Drainage and the Rainy Season

Water destroys play areas quietly: it lifts tiles, washes away loose fill and rusts fixings from below. Set the falls so that water leaves the play and landing zones rather than pooling in them, include surface drains on the low side of each zone, and design access paths to stay usable after heavy rain. A park that drains well can open within an hour of a tropical downpour.

Materials That Survive Humidity

Humidity attacks fasteners, bearings and painted steel long before it attacks structural members. Specify hot dip galvanised or stainless fixings, powder coated frames and UV stabilised plastic and UV resistant colour finishes, and avoid mixing dissimilar metals where moisture collects. Composite and aluminium components cost more at purchase and much less over ten years of tropical operation.

A Maintenance Calendar for Tropical Sites

Plan maintenance around the climate: monthly corrosion and surfacing checks during the wet season, pre season shade and netting inspection before the busy period, and a post storm walk that checks trees, fixings and drainage. Record everything, because a written log is what proves the park is looked after when an inspector or an insurer asks.


Maatwerk en site-fit

Al het zichtbare is aan jou om te definiëren: Shade, opduiken, planting and material specifications.

Als directe leverancier wij beheersen de hele keten: engineering, productie, fabriekstesten en exportverpakking vinden allemaal plaats in een productiebasis van 125.000 vierkante meter, en de lijst met reserveonderdelen volgt de machine naar uw locatie. Projectwerkzaamheden omvatten lay-outtekeningen, gefaseerde uitrustingslijsten en documentatie die u rechtstreeks aan een plaatselijke aannemer kunt overhandigen.

Stuur uw plotplan, budgetbereik en beoogde openingsdatum – wij sturen u een gefaseerd voorstel terug waarmee u rechtstreeks naar uw bestuur kunt gaan.