In a tropical park the equipment is rarely the problem. The heat, the rain and the drainage are.

Design for climate first and the equipment lasts longer, guests stay longer and the maintenance bill drops – which is the opposite of how most parks are planned.

shaded outdoor play area

Wichtige Spezifikationen

Artikel Referenz
Shade coverage Prioritise the busiest play areas
Auftauchen Draining surfaces such as wet pour or tiles
Drainage Falls away from play and landing zones
Materialien UV stable coatings and corrosion resistant fixings
Planting Non-toxic, low shedding species
Wartung Monthly corrosion and surfacing checks

Alle Angaben sind Richtwerte und werden im Planungsvorschlag für Ihren Standort bestätigt.

outdoor play surfacing

Heat Is the Real Design Constraint

Metal slides become unusable at midday, rubber surfacing softens and families leave before lunch. Shade over the busiest play areas extends usable hours more cheaply than adding equipment, and it protects surfacing from cracking. Prioritise shade over the toddler area, the slide exits and the seating, then extend coverage as revenue allows. Equipment such as our Nicht angetriebener Spielplatz im Freien range is specified with tropical installation in mind.

Drainage and the Rainy Season

Water destroys play areas quietly: it lifts tiles, washes away loose fill and rusts fixings from below. Set the falls so that water leaves the play and landing zones rather than pooling in them, include surface drains on the low side of each zone, and design access paths to stay usable after heavy rain. A park that drains well can open within an hour of a tropical downpour.

Materials That Survive Humidity

Humidity attacks fasteners, bearings and painted steel long before it attacks structural members. Specify hot dip galvanised or stainless fixings, powder coated frames and UV stabilised plastic and UV resistant colour finishes, and avoid mixing dissimilar metals where moisture collects. Composite and aluminium components cost more at purchase and much less over ten years of tropical operation.

A Maintenance Calendar for Tropical Sites

Plan maintenance around the climate: monthly corrosion and surfacing checks during the wet season, pre season shade and netting inspection before the busy period, and a post storm walk that checks trees, fixings and drainage. Record everything, because a written log is what proves the park is looked after when an inspector or an insurer asks.


Anpassung und Site-Fit

Alles Sichtbare liegt in Ihrer Hand: Schatten, Auftauchen, planting and material specifications.

Als direkt Anbieter Wir kontrollieren die gesamte Kette: Maschinenbau, Produktion, Werkstests und Exportverpackung finden alle innerhalb einer 125.000 Quadratmeter großen Produktionsbasis statt, und die Ersatzteilliste folgt der Maschine bis zu Ihrem Standort. Die Projektarbeit umfasst Layoutzeichnungen, Gestaffelte Ausrüstungslisten und Dokumentationen, die Sie direkt an einen örtlichen Auftragnehmer weitergeben können.

Senden Sie Ihren Grundstücksplan, Budgetspanne und angestrebtes Eröffnungsdatum – Wir senden Ihnen einen schrittweisen Vorschlag zurück, den Sie direkt an Ihren Vorstand weiterleiten können.