In a tropical park the equipment is rarely the problem. The heat, the rain and the drainage are.
Design for climate first and the equipment lasts longer, guests stay longer and the maintenance bill drops – which is the opposite of how most parks are planned.

Specifiche chiave
| Articolo | Riferimento |
|---|---|
| Shade coverage | Prioritise the busiest play areas |
| Affioramento | Draining surfaces such as wet pour or tiles |
| Drenaggio | Falls away from play and landing zones |
| Materiali | UV stable coatings and corrosion resistant fixings |
| Planting | Non-toxic, low shedding species |
| Manutenzione | Monthly corrosion and surfacing checks |
Tutti i valori sono valori di riferimento e sono confermati nella proposta ingegneristica per il vostro sito.

Heat Is the Real Design Constraint
Metal slides become unusable at midday, rubber surfacing softens and families leave before lunch. Shade over the busiest play areas extends usable hours more cheaply than adding equipment, and it protects surfacing from cracking. Prioritise shade over the toddler area, the slide exits and the seating, then extend coverage as revenue allows. Equipment such as our parco giochi all'aperto non alimentato range is specified with tropical installation in mind.
Drainage and the Rainy Season
Water destroys play areas quietly: it lifts tiles, washes away loose fill and rusts fixings from below. Set the falls so that water leaves the play and landing zones rather than pooling in them, include surface drains on the low side of each zone, and design access paths to stay usable after heavy rain. A park that drains well can open within an hour of a tropical downpour.
Materials That Survive Humidity
Humidity attacks fasteners, bearings and painted steel long before it attacks structural members. Specify hot dip galvanised or stainless fixings, powder coated frames and UV stabilised plastic and UV resistant colour finishes, and avoid mixing dissimilar metals where moisture collects. Composite and aluminium components cost more at purchase and much less over ten years of tropical operation.
A Maintenance Calendar for Tropical Sites
Plan maintenance around the climate: monthly corrosion and surfacing checks during the wet season, pre season shade and netting inspection before the busy period, and a post storm walk that checks trees, fixings and drainage. Record everything, because a written log is what proves the park is looked after when an inspector or an insurer asks.
Personalizzazione e adattamento al sito
Tutto ciò che è visibile spetta a te definirlo: Ombra, affioramento, planting and material specifications.
Come diretto fornitore controlliamo l'intera catena: ingegneria, produzione, i test in fabbrica e l'imballaggio per l'esportazione si svolgono tutti all'interno di una base produttiva di 125.000 metri quadrati, e la lista dei ricambi segue la macchina fino al tuo cantiere. Il lavoro del progetto include disegni di layout, elenchi e documentazione graduali delle attrezzature che puoi consegnare direttamente a un appaltatore locale.
Invia la tua planimetria, intervallo di budget e data di apertura prevista – restituiremo una proposta graduale che potrai portare direttamente al tuo consiglio.