Clients planning an opening date usually reverse the sequence: they book the ride first and prepare the site later. That is exactly how projects lose a season.

The realistic timeline runs from production through shipping and customs to installation, and only one of those stages is under the supplier’s control.

installation schedule on site

Βασικές Προδιαγραφές

Είδος Αναφορά
Παραγωγή Confirmed per product, quantity and options
Sea freight Depends on route, port and schedule
Customs Documentation must be ready before arrival
Εγκατάσταση Days for small rides, weeks for structures
Site readiness The single biggest variable
Fastest result Order against a prepared site

Όλα τα στοιχεία είναι τιμές αναφοράς και επιβεβαιώνονται στην πρόταση μηχανικής για τον ιστότοπό σας.

ride commissioning after installation

Production and Factory Testing

Production time depends on the product, the quantity and the options chosen, and it starts when drawings are approved – not when the order is discussed. Every ride is assembled and tested at the factory before shipment, which is the stage that catches electrical and mechanical faults while they are still cheap to fix. Ask for the test record and photographs before the container doors close.

Sea Freight and Customs

Shipping time varies with the route, the vessel schedule and the port of discharge, and customs clearance adds its own window. The practical protection against delay is documentation: packing lists, invoices, certificates and drawings prepared early and checked before dispatch. Buyers should also confirm who clears the goods, who pays port charges and how the container will be moved inland once released.

Installation Time on Site

Small rides can be installed in a few days; a large structure takes weeks and needs a crane for specific lifts. Installation time is driven by how ready the site is, not by the size of the crew, which is why foundations, power and access should be finished before the equipment arrives – the checklist is in our guide to site preparation before installation.

Protecting Your Opening Date

Work backwards from opening day: allow installation and commissioning time, then customs, then freight, then production. Anything less than that total is a hope rather than a schedule. Booking installation support early, and completing foundations while the container is at sea, is what keeps an opening date intact.


Τι μπορείτε να προσαρμόσετε

Η προσαρμογή καλύπτει τα εξαρτήματα που παρατηρούν πραγματικά οι επισκέπτες: Παραγωγή, shipping and installation schedules.

Our 125,000-square-metre production base covers fabrication, γείσο, συναρμολόγηση και δοκιμή κάτω από μια στέγη, Έτσι, η προσαρμοσμένη εργασία και η τυπική παραγωγή λειτουργούν δίπλα δίπλα χωρίς να ανταγωνίζονται για χωρητικότητα. Οι οικογενειακές βόλτες αποστέλλονται με προδιαγραφές συγκράτησης, προφίλ κύκλου και αριθμοί χωρητικότητας για κάθε διαμόρφωση.

Στείλτε το σχέδιο του πάρκου σας και τις ηλικιακές ομάδες που θέλετε να εξυπηρετήσετε – θα επιστρέψουμε μια διάταξη με χωρητικότητα, απαιτήσεις ισχύος και τιμολόγηση.