Clients planning an opening date usually reverse the sequence: they book the ride first and prepare the site later. That is exactly how projects lose a season.

The realistic timeline runs from production through shipping and customs to installation, and only one of those stages is under the supplier’s control.

installation schedule on site

Spécifications clés

Article Référence
Production Confirmed per product, quantity and options
Sea freight Depends on route, port and schedule
Customs Documentation must be ready before arrival
Installation Days for small rides, weeks for structures
Site readiness The single biggest variable
Fastest result Order against a prepared site

Tous les chiffres sont des valeurs de référence et sont confirmés dans la proposition d'ingénierie de votre site.

ride commissioning after installation

Production and Factory Testing

Production time depends on the product, the quantity and the options chosen, and it starts when drawings are approved – not when the order is discussed. Every ride is assembled and tested at the factory before shipment, which is the stage that catches electrical and mechanical faults while they are still cheap to fix. Ask for the test record and photographs before the container doors close.

Sea Freight and Customs

Shipping time varies with the route, the vessel schedule and the port of discharge, and customs clearance adds its own window. The practical protection against delay is documentation: packing lists, invoices, certificates and drawings prepared early and checked before dispatch. Buyers should also confirm who clears the goods, who pays port charges and how the container will be moved inland once released.

Installation Time on Site

Small rides can be installed in a few days; a large structure takes weeks and needs a crane for specific lifts. Installation time is driven by how ready the site is, not by the size of the crew, which is why foundations, power and access should be finished before the equipment arrives – the checklist is in our guide to site preparation before installation.

Protecting Your Opening Date

Work backwards from opening day: allow installation and commissioning time, then customs, then freight, then production. Anything less than that total is a hope rather than a schedule. Booking installation support early, and completing foundations while the container is at sea, is what keeps an opening date intact.


Ce que vous pouvez personnaliser

La personnalisation couvre les pièces que les invités remarquent réellement: Production, shipping and installation schedules.

Our 125,000-square-metre production base covers fabrication, moulage, assemblage et tests sous un même toit, Ainsi, le travail sur mesure et la production standard fonctionnent côte à côte sans rivaliser en termes de capacité.. Les promenades en famille sont livrées avec des spécifications de retenue, profils de cycle et chiffres de capacité pour chaque configuration.

Envoyez votre plan de parc et les tranches d'âge que vous souhaitez desservir – nous vous retournerons une mise en page avec capacité, besoin en énergie et tarification.