Clients planning an opening date usually reverse the sequence: they book the ride first and prepare the site later. That is exactly how projects lose a season.
The realistic timeline runs from production through shipping and customs to installation, and only one of those stages is under the supplier’s control.

Belangrijkste specificaties
| Item | Referentie |
|---|---|
| Productie | Confirmed per product, quantity and options |
| Sea freight | Depends on route, port and schedule |
| Customs | Documentation must be ready before arrival |
| Installatie | Days for small rides, weeks for structures |
| Site readiness | The single biggest variable |
| Fastest result | Order against a prepared site |
Alle cijfers zijn referentiewaarden en worden bevestigd in het technische voorstel voor uw locatie.

Production and Factory Testing
Production time depends on the product, the quantity and the options chosen, and it starts when drawings are approved – not when the order is discussed. Every ride is assembled and tested at the factory before shipment, which is the stage that catches electrical and mechanical faults while they are still cheap to fix. Ask for the test record and photographs before the container doors close.
Sea Freight and Customs
Shipping time varies with the route, the vessel schedule and the port of discharge, and customs clearance adds its own window. The practical protection against delay is documentation: packing lists, invoices, certificates and drawings prepared early and checked before dispatch. Buyers should also confirm who clears the goods, who pays port charges and how the container will be moved inland once released.
Installation Time on Site
Small rides can be installed in a few days; a large structure takes weeks and needs a crane for specific lifts. Installation time is driven by how ready the site is, not by the size of the crew, which is why foundations, power and access should be finished before the equipment arrives – the checklist is in our guide to site preparation before installation.
Protecting Your Opening Date
Work backwards from opening day: allow installation and commissioning time, then customs, then freight, then production. Anything less than that total is a hope rather than a schedule. Booking installation support early, and completing foundations while the container is at sea, is what keeps an opening date intact.
Wat u kunt aanpassen
Maatwerk omvat de onderdelen die gasten daadwerkelijk opmerken: Productie, shipping and installation schedules.
Our 125,000-square-metre production base covers fabrication, gieten, assemblage en testen onder één dak, Maatwerk en standaardproductie lopen dus naast elkaar, zonder dat er om capaciteit wordt geconcurreerd. Familieritten worden geleverd met beveiligingsspecificaties, cyclusprofielen en capaciteitscijfers voor elke configuratie.
Stuur uw parkplan en de leeftijdsgroepen die u wilt bedienen – wij sturen u een indeling met capaciteit terug, stroombehoefte en prijs.
