Clients planning an opening date usually reverse the sequence: they book the ride first and prepare the site later. That is exactly how projects lose a season.

The realistic timeline runs from production through shipping and customs to installation, and only one of those stages is under the supplier’s control.

installation schedule on site

주요 사양

목 참조
생산 Confirmed per product, quantity and options
Sea freight Depends on route, port and schedule
Customs Documentation must be ready before arrival
설치 Days for small rides, weeks for structures
Site readiness The single biggest variable
Fastest result Order against a prepared site

모든 수치는 참조 값이며 귀하의 현장에 대한 엔지니어링 제안에서 확인되었습니다..

ride commissioning after installation

Production and Factory Testing

Production time depends on the product, the quantity and the options chosen, and it starts when drawings are approved – not when the order is discussed. Every ride is assembled and tested at the factory before shipment, which is the stage that catches electrical and mechanical faults while they are still cheap to fix. Ask for the test record and photographs before the container doors close.

Sea Freight and Customs

Shipping time varies with the route, the vessel schedule and the port of discharge, and customs clearance adds its own window. The practical protection against delay is documentation: packing lists, invoices, certificates and drawings prepared early and checked before dispatch. Buyers should also confirm who clears the goods, who pays port charges and how the container will be moved inland once released.

Installation Time on Site

Small rides can be installed in a few days; a large structure takes weeks and needs a crane for specific lifts. Installation time is driven by how ready the site is, not by the size of the crew, which is why foundations, power and access should be finished before the equipment arrives – the checklist is in our guide to site preparation before installation.

Protecting Your Opening Date

Work backwards from opening day: allow installation and commissioning time, then customs, then freight, then production. Anything less than that total is a hope rather than a schedule. Booking installation support early, and completing foundations while the container is at sea, is what keeps an opening date intact.


당신이 조정할 수 있는 것

고객이 실제로 알아차리는 부분을 맞춤화합니다.: 생산, shipping and installation schedules.

Our 125,000-square-metre production base covers fabrication, 조형, 한 지붕 아래에서 조립 및 테스트, 따라서 맞춤형 작업과 표준 생산이 용량 경쟁 없이 나란히 실행됩니다.. 구속 사양을 갖춘 가족용 놀이기구, 각 구성의 사이클 프로필 및 용량 수치.

공원 계획과 봉사하려는 연령 그룹을 보내십시오. – 용량이 포함된 레이아웃을 반환하겠습니다., 전력 요구 사항 및 가격.