Clients planning an opening date usually reverse the sequence: they book the ride first and prepare the site later. That is exactly how projects lose a season.
The realistic timeline runs from production through shipping and customs to installation, and only one of those stages is under the supplier’s control.

Specifiche chiave
| Articolo | Riferimento |
|---|---|
| Produzione | Confirmed per product, quantity and options |
| Sea freight | Depends on route, port and schedule |
| Customs | Documentation must be ready before arrival |
| Installazione | Days for small rides, weeks for structures |
| Site readiness | The single biggest variable |
| Fastest result | Order against a prepared site |
Tutti i valori sono valori di riferimento e sono confermati nella proposta ingegneristica per il vostro sito.

Production and Factory Testing
Production time depends on the product, the quantity and the options chosen, and it starts when drawings are approved – not when the order is discussed. Every ride is assembled and tested at the factory before shipment, which is the stage that catches electrical and mechanical faults while they are still cheap to fix. Ask for the test record and photographs before the container doors close.
Sea Freight and Customs
Shipping time varies with the route, the vessel schedule and the port of discharge, and customs clearance adds its own window. The practical protection against delay is documentation: packing lists, invoices, certificates and drawings prepared early and checked before dispatch. Buyers should also confirm who clears the goods, who pays port charges and how the container will be moved inland once released.
Installation Time on Site
Small rides can be installed in a few days; a large structure takes weeks and needs a crane for specific lifts. Installation time is driven by how ready the site is, not by the size of the crew, which is why foundations, power and access should be finished before the equipment arrives – the checklist is in our guide to site preparation before installation.
Protecting Your Opening Date
Work backwards from opening day: allow installation and commissioning time, then customs, then freight, then production. Anything less than that total is a hope rather than a schedule. Booking installation support early, and completing foundations while the container is at sea, is what keeps an opening date intact.
Cosa puoi personalizzare
La personalizzazione copre le parti effettivamente notate dagli ospiti: Produzione, shipping and installation schedules.
Our 125,000-square-metre production base covers fabrication, stampaggio, assemblaggio e test sotto lo stesso tetto, quindi il lavoro su misura e la produzione standard coesistono fianco a fianco senza competere in termini di capacità. Le giostre per famiglie vengono spedite con specifiche di ritenuta, profili di ciclo e dati di capacità per ciascuna configurazione.
Invia la planimetria del tuo parco e le fasce d'età che vuoi servire – restituiremo un layout con capacità, requisiti di potenza e prezzi.