Paquete de centro de juego suave

  • Alcance del paquete: Diseño, equipo, envío, soporte de instalación
  • Área típica: 300 a 800 metros cuadrados
  • Equipo básico: Torres, diapositivas, piscina de bolas, zona de niños pequeños
  • Áreas de apoyo: Recepción, cafetería, sala de fiestas, baños
  • Materiales: Espuma, marcos de vinilo y acero acolchado

Último precio, Por favor contáctenos!

Opening a soft play centre is not a purchase, it is a project – and the operators who succeed treat the layout drawing as the most important document they will sign.

A package approach keeps the equipment, the building services and the operating model aligned, which is why turnkey projects open on schedule and self assembled ones do not.

soft play centre play structure

Especificaciones clave

Artículo Referencia
Alcance del paquete Diseño, equipo, envío, soporte de instalación
Área típica 300 a 800 metros cuadrados
Equipo básico Torres, diapositivas, piscina de bolas, zona de niños pequeños
Áreas de apoyo Recepción, cafetería, sala de fiestas, baños
Materiales Espuma, marcos de vinilo y acero acolchado
Timeline Confirmed after design approval

Todas las cifras son valores de referencia y están confirmados en la propuesta de ingeniería para su sitio..

indoor soft play centre package

Soft Play Centre Package Specifications

The package covers layout design for your unit, the equipment set for each age zone, shipping in containers, and installation support on site. Typical venues of 300 a 800 square metres include a main play structure with slides and ball pool, a toddler zone, a party room and a reception with cafe. Materials are foam, reinforced vinyl and padded steel frames, and every element is detailed on the layout so lighting, power and air conditioning can be coordinated before installation.

What a Turnkey Package Should Include

A complete package answers questions the equipment list cannot: where the play structure sits relative to the entrance, how many children can be inside at once, where staff can see the whole floor, and where the cafe serves without blocking circulation. Ask for the drawing set, the bill of materials, the loading plan for containers and an installation sequence, because those documents are what your contractor will price against.

Zonificación y supervisión por edades

Split the floor into under fives and older children, and keep the boundary visible so parents understand it without reading a sign. Place the toddler zone next to the seating, keep the tallest slides towards the back wall, and set a maximum capacity that staff can actually monitor. Venues that also run a equipo de centro de juegos blandos upgrade later usually add a party room or a trampoline court rather than more play structure.

Safety Standards, Cleaning and Staff Routine

Relleno, red, fall heights and entrapment gaps should all follow recognised playground safety principles such as EN 1176. Operationally, the three that matter daily are a sock or shoe policy, a logged cleaning routine for ball pools and soft surfaces, and a written check of netting, padding and fixings before opening. Keep the log where inspectors can see it, not in a drawer.

Opciones y tematización

Haz que combine con tu marca: Tema, combinación de colores, play structure design, toddler zone size, cafe and party room fit out.

Nuestro 125,000 base de producción de metros cuadrados cubre la fabricación, moldura, montaje y pruebas bajo un mismo techo, por lo que el trabajo personalizado y la producción estándar se ejecutan uno al lado del otro sin competir por la capacidad. Las instalaciones interiores se envían con comprobaciones de carga en el suelo y espacio libre en el techo., porque esos dos números deciden lo que se puede instalar.

Enviar plano de planta y altura del techo. – Le devolveremos un dibujo de zonificación con capacidad., lista de equipos y precios.

Contáctenos!