Installation is a sequence, not a task. Follow it and the machine is running on schedule; skip a step and the delay appears later, usually on opening day.
This is the on site routine we run with local crews, from the first foundation survey to the handover checklist.

Especificaciones clave
| Artículo | Referencia |
|---|---|
| Step 1 | Confirm foundations and anchor positions |
| Step 2 | Assemble in the factory sequence |
| Step 3 | Electrical connection and earthing |
| Step 4 | Function and load commissioning |
| Step 5 | Operator and maintenance training |
| Entregar | Signed checklist and documentation set |
Todas las cifras son valores de referencia y están confirmados en la propuesta de ingeniería para su sitio.. Commissioning is the formal handover from installation to operation, and it ends with signed records. Ver commissioning para el fondo.

Foundations and Assembly
The first job on site is not assembly, it is verification: foundations surveyed, anchor bolts checked against the drawing, and the base line confirmed. Assembly then follows the factory sequence, with torque values recorded and photographs taken at each stage so the factory can confirm progress remotely. Local labour usually carries out the work under a factory technician’s supervision.
Electrical Connection and Earthing
Electrical work follows the schematic supplied with the machine: supply, distribution, earthing and control wiring. Earthing is not optional in a tropical site with high rainfall, and every terminal is checked before power is applied for the first time. Cable routing is planned so that it can be inspected later without dismantling the ride.
Commissioning and Load Checks
Commissioning covers start and stop sequences, emergency stops, restraint locking, brake performance, travel limits and a full operating cycle. Where the design requires load testing, it is carried out and recorded before guests board. Iluminación, sound and any show programme are commissioned at the same time so the ride opens complete rather than finished later.
Training and Handover
Training happens on the machine: operators on start-up, loading, restraint checks and evacuation, and maintenance staff on the inspection routine, lubrication and wear parts. Handover ends with a signed checklist plus manuals, drawings, schematics and test records. Projects that follow this path – de un park project to a single ride replacement – open on the date planned.
Opciones de tema y acabado
Haz que combine con tu marca: Installation model, supervision level and training scope.
Equipos como este se fabrican, carga probada y contenedor cargado en nuestro 125,000 instalación de metros cuadrados por el mismo fabricante de atracciones, luego respaldado con repuestos y asesoramiento técnico mucho después de la puesta en servicio. El trabajo del proyecto incluye dibujos de diseño., Listas de equipos por fases y documentación que puede entregar directamente a un contratista local..
Envía tu plano de parcela, rango de presupuesto y fecha de apertura objetivo – Le devolveremos una propuesta gradual que podrá llevar directamente a su junta directiva..