Forfait Soft Play Center
- Portée du package: Conception, équipement, expédition, aide à l'installation
- Zone typique: 300 à 800 m²
- Équipement de base: Tours, diapositives, piscine à balles, zone des tout-petits
- Zones d'assistance: Réception, café, salle de fête, toilettes
- Matériels: Mousse, cadres en vinyle et en acier rembourré
Dernier prix, Veuillez nous contacter!
Opening a soft play centre is not a purchase, it is a project – and the operators who succeed treat the layout drawing as the most important document they will sign.
A package approach keeps the equipment, the building services and the operating model aligned, which is why turnkey projects open on schedule and self assembled ones do not.

Spécifications clés
| Article | Référence |
|---|---|
| Portée du package | Conception, équipement, expédition, aide à l'installation |
| Zone typique | 300 à 800 m² |
| Équipement de base | Tours, diapositives, piscine à balles, zone des tout-petits |
| Zones d'assistance | Réception, café, salle de fête, toilettes |
| Matériels | Mousse, cadres en vinyle et en acier rembourré |
| Timeline | Confirmed after design approval |
Tous les chiffres sont des valeurs de référence et sont confirmés dans la proposition d'ingénierie de votre site.

Soft Play Centre Package Specifications
The package covers layout design for your unit, the equipment set for each age zone, shipping in containers, and installation support on site. Typical venues of 300 à 800 square metres include a main play structure with slides and ball pool, a toddler zone, a party room and a reception with cafe. Materials are foam, reinforced vinyl and padded steel frames, and every element is detailed on the layout so lighting, power and air conditioning can be coordinated before installation.
What a Turnkey Package Should Include
A complete package answers questions the equipment list cannot: where the play structure sits relative to the entrance, how many children can be inside at once, where staff can see the whole floor, and where the cafe serves without blocking circulation. Ask for the drawing set, the bill of materials, the loading plan for containers and an installation sequence, because those documents are what your contractor will price against.
Zonage par âge et surveillance
Split the floor into under fives and older children, and keep the boundary visible so parents understand it without reading a sign. Place the toddler zone next to the seating, keep the tallest slides towards the back wall, and set a maximum capacity that staff can actually monitor. Venues that also run a équipement de centre de jeu doux upgrade later usually add a party room or a trampoline court rather than more play structure.
Safety Standards, Cleaning and Staff Routine
Rembourrage, filets, fall heights and entrapment gaps should all follow recognised playground safety principles such as DANS 1176. Operationally, the three that matter daily are a sock or shoe policy, a logged cleaning routine for ball pools and soft surfaces, and a written check of netting, padding and fixings before opening. Keep the log where inspectors can see it, not in a drawer.
Options et thème
Adaptez-le à votre marque: Thème, jeu de couleurs, play structure design, toddler zone size, cafe and party room fit out.
Notre 125,000 la base de production en m² couvre la fabrication, moulage, assemblage et tests sous un même toit, Ainsi, le travail sur mesure et la production standard fonctionnent côte à côte sans rivaliser en termes de capacité.. Les installations intérieures sont livrées avec des contrôles de charge au sol et de dégagement au plafond, parce que ces deux chiffres décident de ce qui peut être installé.
Envoyer le plan et la hauteur sous plafond – nous vous retournerons un plan de zonage avec capacité, liste du matériel et tarifs.
Contactez-nous!











