Soft Play Center-Paket
- Paketumfang: Design, Ausrüstung, Versand, Installationsunterstützung
- Typische Gegend: 300 Zu 800 Quadratmeter
- Kernausrüstung: Türme, Folien, Bällebad, Kleinkinderzone
- Unterstützungsbereiche: Rezeption, Cafe, Partyraum, Toiletten
- Materialien: Schaum, Vinyl- und gepolsterte Stahlrahmen
Letzter Preis, Bitte kontaktieren Sie uns!
Opening a soft play centre is not a purchase, it is a project – and the operators who succeed treat the layout drawing as the most important document they will sign.
A package approach keeps the equipment, the building services and the operating model aligned, which is why turnkey projects open on schedule and self assembled ones do not.

Wichtige Spezifikationen
| Artikel | Referenz |
|---|---|
| Paketumfang | Design, Ausrüstung, Versand, Installationsunterstützung |
| Typische Gegend | 300 Zu 800 Quadratmeter |
| Kernausrüstung | Türme, Folien, Bällebad, Kleinkinderzone |
| Unterstützungsbereiche | Rezeption, Cafe, Partyraum, Toiletten |
| Materialien | Schaum, Vinyl- und gepolsterte Stahlrahmen |
| Timeline | Confirmed after design approval |
Alle Angaben sind Richtwerte und werden im Planungsvorschlag für Ihren Standort bestätigt.

Soft Play Centre Package Specifications
The package covers layout design for your unit, the equipment set for each age zone, shipping in containers, and installation support on site. Typical venues of 300 Zu 800 square metres include a main play structure with slides and ball pool, a toddler zone, a party room and a reception with cafe. Materials are foam, reinforced vinyl and padded steel frames, and every element is detailed on the layout so lighting, power and air conditioning can be coordinated before installation.
What a Turnkey Package Should Include
A complete package answers questions the equipment list cannot: where the play structure sits relative to the entrance, how many children can be inside at once, where staff can see the whole floor, and where the cafe serves without blocking circulation. Ask for the drawing set, the bill of materials, the loading plan for containers and an installation sequence, because those documents are what your contractor will price against.
Alterseinteilung und Aufsicht
Split the floor into under fives and older children, and keep the boundary visible so parents understand it without reading a sign. Place the toddler zone next to the seating, keep the tallest slides towards the back wall, and set a maximum capacity that staff can actually monitor. Venues that also run a Softplay-Center-Ausstattung upgrade later usually add a party room or a trampoline court rather than more play structure.
Safety Standards, Cleaning and Staff Routine
Polsterung, Netz, fall heights and entrapment gaps should all follow recognised playground safety principles such as IN 1176. Operationally, the three that matter daily are a sock or shoe policy, a logged cleaning routine for ball pools and soft surfaces, and a written check of netting, padding and fixings before opening. Keep the log where inspectors can see it, not in a drawer.
Optionen und Themen
Passen Sie es an Ihre Marke an: Thema, Farbschema, play structure design, toddler zone size, cafe and party room fit out.
Unser 125,000 qm Produktionsbasis umfasst Fertigung, Formen, Montage und Prüfung unter einem Dach, So laufen Sonderanfertigungen und Standardproduktion nebeneinander, ohne dass sie um Kapazitäten konkurrieren. Bei Installationen im Innenbereich werden Bodenbelastungs- und Deckenabstandsprüfungen durchgeführt, denn diese beiden Zahlen entscheiden darüber, was installiert werden kann.
Senden Sie den Grundriss und die Deckenhöhe – Wir werden Ihnen einen Zonenplan mit Kapazität zurücksenden, Ausstattungsliste und Preise.
Kontaktieren Sie uns!











