Soft Play Center-pakket

  • Pakketomvang: Ontwerp, apparatuur, verzending, ondersteuning bij installatie
  • Typisch gebied: 300 naar 800 vierkante meter
  • Kernuitrusting: Torens, dia's, ballenbad, peuterzone
  • Ondersteuningsgebieden: Receptie, café, feestzaal, Toiletten
  • Materialen: Schuim, vinyl en gewatteerde stalen frames

Laatste prijs, Neem contact met ons op!

Opening a soft play centre is not a purchase, it is a project – and the operators who succeed treat the layout drawing as the most important document they will sign.

A package approach keeps the equipment, the building services and the operating model aligned, which is why turnkey projects open on schedule and self assembled ones do not.

soft play centre play structure

Belangrijkste specificaties

Item Referentie
Pakketomvang Ontwerp, apparatuur, verzending, ondersteuning bij installatie
Typisch gebied 300 naar 800 vierkante meter
Kernuitrusting Torens, dia's, ballenbad, peuterzone
Ondersteuningsgebieden Receptie, café, feestzaal, Toiletten
Materialen Schuim, vinyl en gewatteerde stalen frames
Timeline Confirmed after design approval

Alle cijfers zijn referentiewaarden en worden bevestigd in het technische voorstel voor uw locatie.

indoor soft play centre package

Soft Play Centre Package Specifications

The package covers layout design for your unit, the equipment set for each age zone, shipping in containers, and installation support on site. Typical venues of 300 naar 800 square metres include a main play structure with slides and ball pool, a toddler zone, a party room and a reception with cafe. Materials are foam, reinforced vinyl and padded steel frames, and every element is detailed on the layout so lighting, power and air conditioning can be coordinated before installation.

What a Turnkey Package Should Include

A complete package answers questions the equipment list cannot: where the play structure sits relative to the entrance, how many children can be inside at once, where staff can see the whole floor, and where the cafe serves without blocking circulation. Ask for the drawing set, the bill of materials, the loading plan for containers and an installation sequence, because those documents are what your contractor will price against.

Leeftijdszonering en toezicht

Split the floor into under fives and older children, and keep the boundary visible so parents understand it without reading a sign. Place the toddler zone next to the seating, keep the tallest slides towards the back wall, and set a maximum capacity that staff can actually monitor. Venues that also run a uitrusting voor zacht speelcentrum upgrade later usually add a party room or a trampoline court rather than more play structure.

Safety Standards, Cleaning and Staff Routine

Opvulling, net, fall heights and entrapment gaps should all follow recognised playground safety principles such as IN 1176. Operationally, the three that matter daily are a sock or shoe policy, a logged cleaning routine for ball pools and soft surfaces, and a written check of netting, padding and fixings before opening. Keep the log where inspectors can see it, not in a drawer.

Opties en thema's

Zorg ervoor dat het bij uw merk past: Thema, colour scheme, play structure design, toddler zone size, cafe and party room fit out.

Ons 125,000 m² productiebasis omvat fabricage, gieten, assemblage en testen onder één dak, Maatwerk en standaardproductie lopen dus naast elkaar, zonder dat er om capaciteit wordt geconcurreerd. Binneninstallaties worden geleverd met controles op vloerbelasting en plafondvrijheid, omdat die twee cijfers bepalen wat er geïnstalleerd kan worden.

Stuur de plattegrond en plafondhoogte mee – wij sturen u een bestemmingstekening met capaciteit terug, uitrustingslijst en prijzen.

Neem contact met ons op!