Pacchetto giro nel parco acquatico
- Package idea: Matched water attractions for one zone
- Typical mix: Complesso di diapositive, splash play, piscina con cornice, corso di sfida
- Water area: Sized to the available footprint
- Shared systems: Pompe, filtration and plant room
- Operazione: Session tickets with supervised zones
Ultimo prezzo, Si prega di contattarci!
One water attraction brings guests to the gate. A package keeps them inside for the whole afternoon, which is where water parks actually make their money.
A water package is built around shared systems – one plant room, one water team, one ticket desk – so the second and third attractions cost far less than the first.

Specifiche chiave
| Articolo | Riferimento |
|---|---|
| Package idea | Matched water attractions for one zone |
| Typical mix | Complesso di diapositive, splash play, piscina con cornice, corso di sfida |
| Water area | Sized to the available footprint |
| Shared systems | Pompe, filtration and plant room |
| Operazione | Session tickets with supervised zones |
| Consegna | Phased to the opening plan |
Tutti i valori sono valori di riferimento e sono confermati nella proposta ingegneristica per il vostro sito.

Water Park Ride Package Specifications
The package combines attractions that share water treatment and supervision: a slide complex for older children, splash play for younger guests, a supervised pool area and, where space allows, a floating challenge course. Pompe, filtration and the plant room are sized for the whole zone rather than per attraction, and the layout keeps lifeguard sight lines open between zones. Delivery can be phased so the park opens with one wet zone and adds the rest in the following season.
Why a Package Beats One Big Slide
A single large slide has a capacity ceiling and a single price point. A package gives the park several products at different intensity levels, which means families stay longer and the park can price entry, sessions and add-ons separately. Because the water system is shared, the incremental cost of the second attraction is mostly equipment and decking rather than pumps, filtration and pipework.
Sizing the Water Area
Start from the deck, not the water. Guests need somewhere to walk, queue, sit and store bags, and that space is usually the limiting factor rather than the pool itself. As a rule, plan the wet surfaces so that peak guests can move between attractions without crossing the busiest zone, and keep the challenge course – Nostro percorso a ostacoli in acqua is a good example – positioned so spectators on the deck can watch without blocking circulation.
Shared Plant Room and Maintenance
One plant room serving the whole zone is cheaper to build, easier to secure and simpler to maintain than several small installations. Size the pumps with spare capacity, label every valve and pipe, and keep a maintenance board in the room showing filter cleaning, dosing and inspection intervals. Bene filtration practice, recorded daily, is what keeps a water park open through peak season.
Opzioni e temi
Fallo corrispondere al tuo marchio: Attraction mix, tematizzazione, piano di calpestio, splash features and phasing.
Costruiamo attrazioni anziché rivenderle, ecco perché le domande tecniche ritornano sotto forma di disegni invece che di brochure – e perché a 125,000 mq base produttiva può assorbire la personalizzazione senza spostare la data di consegna. I sistemi idrici sono progettati per il tuo sito, quindi il locale tecnico, decking e drenaggio fanno parte dello stesso set di disegni.
Condividi la trama e i dettagli dell'acqua e torneremo con un layout dell'acqua graduale: cosa si apre per primo, ciò che segue, e quanto costa ciascuna fase.
Contattaci!










