A thousand square metres sounds generous until you draw it, and then you discover that the walkway, the shade and the seating decide how much play area actually remains.

This is the layout logic we use when an Indonesian client sends a plot plan and asks the same question: what can 1000 sqm realistically hold, and what should be built first?

non powered park play zone

Ključne specifikacije

Postavka Referenca
Land required 1,000 sq m and above
Core zones Entry plaza, play structure, water and sand play, sedeži, service
Anchor attraction Slide complex or climbing castle
Phase 1 scope Anchor structure plus access, shade and surfacing
Phase 2 options Additional slides, water play, F&B kiosk
Peak staff Two to four attendants plus a supervisor

Vse številke so referenčne vrednosti in so potrjene v inženirskem predlogu za vašo lokacijo.

non powered park equipment

Kaj 1000 sqm Actually Buys You

At this size a non-powered park can hold one anchor structure, one secondary play zone, a wet or sand play area, seating for parents, a service kiosk and the circulation that connects them. Roughly half the plot ends up as play space and the rest becomes walkway, planting, seating and safety clearance, which is why the first drawing should show circulation rather than equipment.

Zoning the Park Around One Anchor

Put the anchor structure where it is visible from the entrance and surround it with lower cost attractions – gugalnice, sand play, a small slide – so guests spread naturally. Keep the toddler area closest to the seating and the cafe, and place the highest energy equipment furthest away, which reduces collisions and noise complaints. The zoning approach we describe in our zabaviščni park brez pogona v Indoneziji guide applies directly at this size.

Phasing the Investment

Phase one should buy the anchor structure, safe surfacing, access paths and shade, because those are the items guests judge instantly. Diapozitivi, water play and food service can follow in phase two and three, funded by early revenue rather than by additional capital. Phasing also spreads shipping and installation cost, which matters when a park is opening under a fixed budget.

Navarjanje, Shade and Maintenance Planning

Surfacing depth follows the fall height of the tallest platform, so it must be designed with the structure rather than after it. In tropical heat, shade over the busiest play areas extends usable hours and protects rubber surfaces from cracking. Plan a routine that covers daily visual checks, weekly bolt and net inspections and monthly surfacing depth checks that follow IN 1176 playground safety principles.


Prilagajanje in prilagajanje spletnega mesta

Vi se odločite za videz, ohranjamo inženirski standard: Postavitev, tema, equipment mix, shade design and phasing plan.

Gradimo atrakcije, namesto da jih preprodajamo, zato se tehnična vprašanja vračajo kot risbe namesto brošur – in zakaj a 125,000 m² proizvodna baza lahko absorbira prilagajanje brez premikanja datuma dostave. Strukture brez pogona so dobavljene s podatki o višini padca in priporočili glede površine za vsako ploščad in drsni izhod.

Pošljite svoj načrt parcele in želeno površino – vrnili bomo postavitev z višinami padca, strategijo senčenja in seznam opreme po fazah.