Every hour spent testing at the factory saves a week on site, because a fault found in China costs a phone call and a fault found overseas costs a crane.

This is the sequence we run before any ride is packed, and the records the client receives before the container doors close.

ride assembly at factory

Ključne specifikacije

Postavka Referenca
Oder 1 Pregled podsklopa med izdelavo
Oder 2 Popolna sestava v tovarni
Oder 3 Funkcijsko in kontrolno testiranje
Oder 4 Obremenitveno testiranje, kjer to zahteva načrt
Zapisi Testni listi, fotografije in video
Result Faults found before shipment, not on opening day

Vse številke so referenčne vrednosti in so potrjene v inženirskem predlogu za vašo lokacijo. Test records are the practical face of quality control, and they travel with the machine.

control system testing

From Sub Assemblies to Full Assembly

Fabrication is inspected in stages: structural welds, machining, electrical panel assembly and finish. The ride is then assembled at the factory as it will stand on site, so tolerances, clearances and interfaces are proven with the actual parts rather than on paper. Assembly photographs are taken at each stage and shared with the client.

Function, Control and Load Testing

The machine is run through its full cycle envelope: start, stop, zaustavitev v sili, restraint locking, brake response, speed and travel limits. Controls are tested in every operating mode, and lighting, sound and drive systems are checked together as a show. Where the design calls for it, loads are applied and measurements recorded against the design values.

Test Records and Client Sign Off

The client receives test sheets, photographs, video of the ride running, and the electrical and mechanical documentation set. That pack is the evidence used later during commissioning and inspection, and it is the reason a defect found on site can be traced quickly to a specific assembly step rather than guessed at.

What Happens When Something Fails The Test

A test failure is a normal event, not an emergency: the part is reworked or replaced and the test repeated, with the corrected result recorded. What matters is that the failure happened before the container was loaded. The same discipline applies to every product family we build, od a techno jump vožnja to a full sized wheel.


Možnosti in tematizacija

Vse, kar je vidno, določite sami: Test scope, documentation pack and inspection access.

Vsaka enota zapusti a 125,000 tovarna kvadratnih metrov na Kitajskem z zapisi o preskusih, risbe in seznam priporočenih rezervnih delov, kar je kaj a proizvodni partner izročiti, ne pa samo fakturirati. Družinske vožnje so opremljene s specifikacijami zadrževalnega sistema, profili ciklov in številke zmogljivosti za vsako konfiguracijo.

Pošljite svoj načrt parka in starostne skupine, ki jim želite služiti – vrnili bomo postavitev s kapaciteto, zahteva po moči in cena.