This project was built for a market with heavy rain and long school holidays, so the design had to keep guests comfortable in the heat and drain quickly in a storm.
The result was a non-powered park with a strong anchor slide complex, climbing and net elements, and a shaded family zone at its centre.

Ključne specifikacije
| Postavka | Referenca |
|---|---|
| Država | Filipini |
| Vrsta projekta | Non-powered family park |
| Contract value | USD 125,000 class project |
| Področje uporabe | Oprema, podpora pri pošiljanju in namestitvi |
| Zmešajte | Kompleks diapozitivov, plezalne mreže, gugalnice, toddler area |
| Podnebje | Tropska vročina, humidity, typhoon season |
Vse številke so referenčne vrednosti in so potrjene v inženirskem predlogu za vašo lokacijo. Design follows recognised playground safety principles such as IN 1176.

Structures and Surfacing
The anchor slide complex carried multiple lanes so throughput stays high on holidays, with climbing towers and net elements providing a route for older children. Surfacing was installed per zone with depth recorded against the highest fall height, which matters where heavy rain can wash loose material out of position.
Drainage and Storm Planning
Falls were set so water leaves the play and landing zones rather than pooling, and access paths were designed to stay usable after a downpour. The park also keeps a simple storm routine: inspect the site after severe weather, check fixings and netting, and record anything that needs attention before reopening.
Shade and Family Comfort
Shade was installed over the busiest structures and the seating before secondary equipment was added. At this latitude the difference is measurable: families stay through the middle of the day instead of leaving at noon, which is what the operator needed to justify the investment.
Operating Model After Opening
The park runs two to four attendants plus a supervisor, with a daily inspection of structures, netting and surfacing. Entry is priced simply, and capacity is managed at the gate rather than on the equipment. The same operating logic appears in our non powered park guide.
Možnosti teme in zaključka
Možnosti, ki jih lahko določite pred začetkom proizvodnje: Postavitev, mix, shade strategy and surfacing specification.
Citiramo kot neposredno proizvajalec opreme od a 125,000 m² proizvodne baze, tako se tehnični pogovor in komercialni zgodita na istem mestu, z 20 leta izvoznih projektov za odgovorom. Strukture brez pogona so dobavljene s podatki o višini padca in priporočili glede površine za vsako ploščad in drsni izhod.
Pošljite svoj načrt parcele in želeno površino – vrnili bomo postavitev z višinami padca, strategijo senčenja in seznam opreme po fazah.