Installation is a sequence, not a task. Follow it and the machine is running on schedule; skip a step and the delay appears later, usually on opening day.

This is the on site routine we run with local crews, from the first foundation survey to the handover checklist.

ride assembly on site

Ključne specifikacije

Postavka Referenca
korak 1 Potrdite temelje in položaje sider
korak 2 Sestavite v tovarniškem zaporedju
korak 3 Električni priključek in ozemljitev
korak 4 Zagon delovanja in obremenitve
korak 5 Usposabljanje operaterjev in vzdrževalcev
Primopredaja Signed checklist and documentation set

Vse številke so referenčne vrednosti in so potrjene v inženirskem predlogu za vašo lokacijo. Commissioning is the formal handover from installation to operation, and it ends with signed records. glej commissioning za ozadje.

ride commissioning checks

Foundations and Assembly

The first job on site is not assembly, it is verification: foundations surveyed, anchor bolts checked against the drawing, and the base line confirmed. Assembly then follows the factory sequence, with torque values recorded and photographs taken at each stage so the factory can confirm progress remotely. Local labour usually carries out the work under a factory technician’s supervision.

Electrical Connection and Earthing

Electrical work follows the schematic supplied with the machine: supply, distribution, earthing and control wiring. Earthing is not optional in a tropical site with high rainfall, and every terminal is checked before power is applied for the first time. Cable routing is planned so that it can be inspected later without dismantling the ride.

Commissioning and Load Checks

Commissioning covers start and stop sequences, emergency stops, restraint locking, brake performance, travel limits and a full operating cycle. Where the design requires load testing, it is carried out and recorded before guests board. Razsvetljava, sound and any show programme are commissioned at the same time so the ride opens complete rather than finished later.

Training and Handover

Training happens on the machine: operators on start-up, loading, restraint checks and evacuation, and maintenance staff on the inspection routine, lubrication and wear parts. Handover ends with a signed checklist plus manuals, drawings, schematics and test records. Projects that follow this path – od a park project to a single ride replacement – open on the date planned.


Možnosti teme in zaključka

Naj se ujema z vašo blagovno znamko: Installation model, supervision level and training scope.

Takšna oprema se proizvaja, obremenitev preizkušena in kontejner naložen pri nas 125,000 kvadratni meter objekta po istem proizvajalec vozil, nato podprto z rezervnimi deli in tehničnimi nasveti še dolgo po zagonu. Projektno delo vključuje tlorisne risbe, fazne sezname opreme in dokumentacijo, ki jih lahko predate neposredno lokalnemu izvajalcu.

Pošljite svoj načrt parcele, obseg proračuna in ciljni datum odprtja – vrnili vam bomo predlog po fazah, ki ga lahko odnesete naravnost v odbor.