A thousand square metres sounds generous until you draw it, and then you discover that the walkway, the shade and the seating decide how much play area actually remains.

This is the layout logic we use when an Indonesian client sends a plot plan and asks the same question: what can 1000 sqm realistically hold, and what should be built first?

non powered park play zone

주요 사양

목 참조
Land required 1,000 sq m and above
Core zones Entry plaza, play structure, water and sand play, 좌석, service
Anchor attraction Slide complex or climbing castle
Phase 1 scope Anchor structure plus access, shade and surfacing
Phase 2 options Additional slides, water play, 에프&B kiosk
Peak staff Two to four attendants plus a supervisor

모든 수치는 참조 값이며 귀하의 현장에 대한 엔지니어링 제안에서 확인되었습니다..

non powered park equipment

무엇 1000 sqm Actually Buys You

At this size a non-powered park can hold one anchor structure, one secondary play zone, a wet or sand play area, seating for parents, a service kiosk and the circulation that connects them. Roughly half the plot ends up as play space and the rest becomes walkway, planting, seating and safety clearance, which is why the first drawing should show circulation rather than equipment.

Zoning the Park Around One Anchor

Put the anchor structure where it is visible from the entrance and surround it with lower cost attractions – swings, sand play, a small slide – so guests spread naturally. Keep the toddler area closest to the seating and the cafe, and place the highest energy equipment furthest away, which reduces collisions and noise complaints. The zoning approach we describe in our 무동력 놀이공원 인도네시아 guide applies directly at this size.

Phasing the Investment

Phase one should buy the anchor structure, safe surfacing, access paths and shade, because those are the items guests judge instantly. 슬라이드, water play and food service can follow in phase two and three, funded by early revenue rather than by additional capital. Phasing also spreads shipping and installation cost, which matters when a park is opening under a fixed budget.

표면화, Shade and Maintenance Planning

Surfacing depth follows the fall height of the tallest platform, so it must be designed with the structure rather than after it. 열대 더위에, shade over the busiest play areas extends usable hours and protects rubber surfaces from cracking. Plan a routine that covers daily visual checks, weekly bolt and net inspections and monthly surfacing depth checks that follow 안에 1176 playground safety principles.


맞춤화 및 사이트 맞춤

외모는 네가 결정해, 우리는 엔지니어링 표준을 유지합니다: 공들여 나열한 것, 주제, 장비 믹스, shade design and phasing plan.

우리는 어트랙션을 재판매하기보다는 구축합니다., 이것이 바로 기술적인 질문이 브로셔 대신 그림으로 돌아오는 이유입니다. – 그리고 왜 125,000 m² 생산기지 배송일을 변경하지 않고도 맞춤화를 수용할 수 있습니다.. 무동력 구조물에는 모든 플랫폼 및 슬라이드 출구에 대한 추락 높이 데이터 및 표면 권장 사항이 함께 제공됩니다..

플롯 계획 및 표면 선호 사항 보내기 – 낙하 높이가 포함된 레이아웃을 반환하겠습니다., 셰이드 전략 및 단계별 장비 목록.