This project was built for a market with heavy rain and long school holidays, so the design had to keep guests comfortable in the heat and drain quickly in a storm.

The result was a non-powered park with a strong anchor slide complex, climbing and net elements, and a shaded family zone at its centre.

climbing equipment for park

Sleutel spesifikasies

Item Verwysing
Land Filippyne
Projek tipe Non-powered family park
Contract value USD 125,000 class project
Omvang Toerusting, versending en installasie ondersteuning
Meng Skyfie kompleks, klimnette, swings, toddler area
Klimaat Tropiese hitte, humidity, typhoon season

Alle syfers is verwysingswaardes en word bevestig in die ingenieursvoorstel vir jou webwerf. Design follows recognised playground safety principles such as IN 1176.

adventure route in play park

Structures and Surfacing

The anchor slide complex carried multiple lanes so throughput stays high on holidays, with climbing towers and net elements providing a route for older children. Surfacing was installed per zone with depth recorded against the highest fall height, which matters where heavy rain can wash loose material out of position.

Drainage and Storm Planning

Falls were set so water leaves the play and landing zones rather than pooling, and access paths were designed to stay usable after a downpour. The park also keeps a simple storm routine: inspect the site after severe weather, check fixings and netting, and record anything that needs attention before reopening.

Shade and Family Comfort

Shade was installed over the busiest structures and the seating before secondary equipment was added. At this latitude the difference is measurable: families stay through the middle of the day instead of leaving at noon, which is what the operator needed to justify the investment.

Operating Model After Opening

The park runs two to four attendants plus a supervisor, with a daily inspection of structures, netting and surfacing. Entry is priced simply, and capacity is managed at the gate rather than on the equipment. The same operating logic appears in our non powered park guide.


Tema en Afwerking Opsies

Opsies wat jy kan spesifiseer voordat produksie begin: Uitleg, mix, shade strategy and surfacing specification.

Ons haal aan as die direkte toerusting vervaardiger van a 125,000 m² produksie basis, dus gebeur die tegniese gesprek en die kommersiële een op dieselfde plek, met 20 jare se uitvoerprojekte agter die antwoord. Nie-aangedrewe strukture word gestuur met valhoogtedata en oppervlakaanbevelings vir elke platform en gly-uitgang.

Stuur jou plotplan en oppervlakvoorkeur – ons sal 'n uitleg met valhoogtes gee, skadustrategie en 'n gefaseerde toerustinglys.