This project was built for a market with heavy rain and long school holidays, so the design had to keep guests comfortable in the heat and drain quickly in a storm.
The result was a non-powered park with a strong anchor slide complex, climbing and net elements, and a shaded family zone at its centre.

Spécifications clés
| Article | Référence |
|---|---|
| Pays | Philippines |
| Type de projet | Parc familial non motorisé |
| Valeur du contrat | USD 125,000 projet de classe |
| Portée | Équipement, assistance à l'expédition et à l'installation |
| Mélanger | Complexe de diapositives, filets d'escalade, oscillations, espace pour les tout-petits |
| Climat | Chaleur tropicale, humidity, typhoon season |
Tous les chiffres sont des valeurs de référence et sont confirmés dans la proposition d'ingénierie de votre site. Design follows recognised playground safety principles such as DANS 1176.

Structures and Surfacing
The anchor slide complex carried multiple lanes so throughput stays high on holidays, with climbing towers and net elements providing a route for older children. Surfacing was installed per zone with depth recorded against the highest fall height, which matters where heavy rain can wash loose material out of position.
Drainage and Storm Planning
Falls were set so water leaves the play and landing zones rather than pooling, and access paths were designed to stay usable after a downpour. The park also keeps a simple storm routine: inspect the site after severe weather, check fixings and netting, and record anything that needs attention before reopening.
Shade and Family Comfort
Shade was installed over the busiest structures and the seating before secondary equipment was added. At this latitude the difference is measurable: families stay through the middle of the day instead of leaving at noon, which is what the operator needed to justify the investment.
Operating Model After Opening
The park runs two to four attendants plus a supervisor, with a daily inspection of structures, netting and surfacing. Entry is priced simply, and capacity is managed at the gate rather than on the equipment. The same operating logic appears in our guide du parc non motorisé.
Options de thème et de finition
Options que vous pouvez spécifier avant le début de la production: Mise en page, mix, shade strategy and surfacing specification.
Nous citons comme direct fabricant d'équipement d'un 125,000 m² de base de production, donc la conversation technique et la conversation commerciale se déroulent au même endroit, avec 20 des années de projets d’exportation derrière la réponse. Les structures non motorisées sont livrées avec des données sur la hauteur de chute et des recommandations de revêtement pour chaque plate-forme et sortie de toboggan..
Envoyez votre plan de parcelle et vos préférences de revêtement – nous vous rendrons un tracé avec des hauteurs de chute, stratégie d'ombrage et liste d'équipement par étapes.