This project was built for a market with heavy rain and long school holidays, so the design had to keep guests comfortable in the heat and drain quickly in a storm.

The result was a non-powered park with a strong anchor slide complex, climbing and net elements, and a shaded family zone at its centre.

climbing equipment for park

主な仕様

アイテム 参照
国 Philippines
プロジェクトの種類 Non-powered family park
Contract value 米ドル 125,000 class project
範囲 装置, 配送と設置のサポート
ミックス Slide complex, 登山用ネット, swings, toddler area
気候 熱帯熱, humidity, typhoon season

すべての数値は参考値であり、お客様のサイトのエンジニアリング提案で確認されます。. Design follows recognised playground safety principles such as で 1176.

adventure route in play park

Structures and Surfacing

The anchor slide complex carried multiple lanes so throughput stays high on holidays, with climbing towers and net elements providing a route for older children. Surfacing was installed per zone with depth recorded against the highest fall height, which matters where heavy rain can wash loose material out of position.

Drainage and Storm Planning

Falls were set so water leaves the play and landing zones rather than pooling, and access paths were designed to stay usable after a downpour. The park also keeps a simple storm routine: inspect the site after severe weather, check fixings and netting, and record anything that needs attention before reopening.

Shade and Family Comfort

Shade was installed over the busiest structures and the seating before secondary equipment was added. At this latitude the difference is measurable: families stay through the middle of the day instead of leaving at noon, which is what the operator needed to justify the investment.

Operating Model After Opening

The park runs two to four attendants plus a supervisor, with a daily inspection of structures, netting and surfacing. Entry is priced simply, and capacity is managed at the gate rather than on the equipment. The same operating logic appears in our non powered park guide.


テーマと仕上げのオプション

生産開始前に指定できるオプション: レイアウト, mix, shade strategy and surfacing specification.

直接引用します 機器メーカー からの 125,000 m²生産拠点, 技術的な会話と商業的な会話が同じ場所で行われる, と 20 答えの裏には長年にわたる輸出プロジェクトがあった. 非動力構造物には、すべてのプラットフォームとスライド出口の落下高さデータと浮上に関する推奨事項が付属しています。.

区画プランと表面の好みを送信してください – 落下高さを含むレイアウトを返します, シェード戦略と段階的な装備リスト.