A non-powered park designed in Europe and rebuilt in Indonesia fails on two things: shade and drainage. Everything else is easier to fix.

These are the adjustments we make when a non-powered park is planned for an Indonesian site rather than a temperate one.

tropical non powered park

Ključne specifikacije

Postavka Referenca
Podnebje Heat, humidity and heavy seasonal rain
Shade Priority over the busiest structures
Drainage Surface falls and drains in every zone
Navarjanje Wet pour, tiles or engineered fill per zone
Staffing Two to four attendants plus a supervisor
Postopnost Anchor structure first, water and F&B later

Vse številke so referenčne vrednosti in so potrjene v inženirskem predlogu za vašo lokacijo.

non powered park play zone

Design for Heat Before You Design for Equipment

Guests decide within minutes whether a park is comfortable, and shade decides that. Put shade over the busiest play structures, the toddler zone and the seating before adding another attraction, and use planting and shade sails rather than buildings so air keeps moving. Metal slides and dark rubber surfaces need particular attention, because an unshaded surface in the afternoon can be unusable regardless of how good the equipment is.

Drainage Is Not an Optional Detail

Tropical rain arrives fast and leaves slowly if the layout does not shed water. Set the falls so that each play zone drains to a defined low point, keep standing water out of landings and walkways, and design drenaža before the surfacing is chosen, and check that loose fill surfacing cannot wash away into drains. A park that drains well reopens within an hour of heavy rain; one that does not may lose the whole afternoon.

Staffing and Operating Reality

Non-powered parks are cheap to run only if the operating model matches the staff you can actually employ. Two to four attendants plus a supervisor is a realistic peak team for a 1000 do 1500 square metre play area, and each zone should be visible from a staffed position. Write the routine – opening checks, zone rotation, closing inspection – because unmaintained equipment fails far more often than equipment that is used hard.

Phasing the Build for Cash Flow

Build the anchor structure and the safe surfacing first, then add the second zone, water play and food service as revenue allows. The growth path from 1000 do 5000 square metres follows the same logic we set out in our guide to scaling a non powered park, and phased sites consistently open earlier than single phase projects of the same final size.


Prilagajanje

Kaj lahko krojiš: Postavitev, shade strategy, surfacing specification and phasing.

Kot neposredno dobavitelj nadzorujemo celotno verigo: inženiring, proizvodnja, tovarniško testiranje in izvozno pakiranje potekata znotraj a 125,000 m² proizvodne baze, in seznam nadomestnih delov sledi stroju do vašega mesta. Strukture brez pogona so dobavljene s podatki o višini padca in priporočili glede površine za vsako ploščad in drsni izhod.

Pošljite svoj načrt parcele in želeno površino – vrnili bomo postavitev z višinami padca, strategijo senčenja in seznam opreme po fazah.