A non-powered park designed in Europe and rebuilt in Indonesia fails on two things: 그늘과 배수. Everything else is easier to fix.

These are the adjustments we make when a non-powered park is planned for an Indonesian site rather than a temperate one.

tropical non powered park

주요 사양

목 참조
기후 Heat, humidity and heavy seasonal rain
Shade Priority over the busiest structures
Drainage Surface falls and drains in every zone
표면화 Wet pour, tiles or engineered fill per zone
Staffing Two to four attendants plus a supervisor
단계적 Anchor structure first, water and F&B later

모든 수치는 참조 값이며 귀하의 현장에 대한 엔지니어링 제안에서 확인되었습니다..

non powered park play zone

Design for Heat Before You Design for Equipment

Guests decide within minutes whether a park is comfortable, and shade decides that. Put shade over the busiest play structures, the toddler zone and the seating before adding another attraction, and use planting and shade sails rather than buildings so air keeps moving. Metal slides and dark rubber surfaces need particular attention, because an unshaded surface in the afternoon can be unusable regardless of how good the equipment is.

Drainage Is Not an Optional Detail

Tropical rain arrives fast and leaves slowly if the layout does not shed water. Set the falls so that each play zone drains to a defined low point, keep standing water out of landings and walkways, and design 배수 before the surfacing is chosen, and check that loose fill surfacing cannot wash away into drains. A park that drains well reopens within an hour of heavy rain; one that does not may lose the whole afternoon.

Staffing and Operating Reality

Non-powered parks are cheap to run only if the operating model matches the staff you can actually employ. Two to four attendants plus a supervisor is a realistic peak team for a 1000 에게 1500 square metre play area, and each zone should be visible from a staffed position. Write the routine – opening checks, zone rotation, closing inspection – because unmaintained equipment fails far more often than equipment that is used hard.

Phasing the Build for Cash Flow

Build the anchor structure and the safe surfacing first, then add the second zone, water play and food service as revenue allows. The growth path from 1000 에게 5000 square metres follows the same logic we set out in our guide to scaling a non powered park, and phased sites consistently open earlier than single phase projects of the same final size.


맞춤화

맞춤 설정할 수 있는 것: 공들여 나열한 것, shade strategy, surfacing specification and phasing.

직접적으로 공급자 우리는 전체 체인을 제어합니다: 공학, 생산, 공장 테스트 및 수출 포장은 모두 공장 내부에서 이루어집니다. 125,000 평방미터 생산 기지, 예비 부품 목록은 기계를 따라 귀하의 사이트로 이동합니다.. 무동력 구조물에는 모든 플랫폼 및 슬라이드 출구에 대한 추락 높이 데이터 및 표면 권장 사항이 함께 제공됩니다..

플롯 계획 및 표면 선호 사항 보내기 – 낙하 높이가 포함된 레이아웃을 반환하겠습니다., 셰이드 전략 및 단계별 장비 목록.