A non-powered park designed in Europe and rebuilt in Indonesia fails on two things: ombre et drainage. Everything else is easier to fix.

These are the adjustments we make when a non-powered park is planned for an Indonesian site rather than a temperate one.

tropical non powered park

Spécifications clés

Article Référence
Climat Heat, humidity and heavy seasonal rain
Shade Priority over the busiest structures
Drainage Surface falls and drains in every zone
Surfaçage Wet pour, tiles or engineered fill per zone
Staffing Two to four attendants plus a supervisor
Phaser Anchor structure first, water and F&B later

Tous les chiffres sont des valeurs de référence et sont confirmés dans la proposition d'ingénierie de votre site.

non powered park play zone

Design for Heat Before You Design for Equipment

Guests decide within minutes whether a park is comfortable, and shade decides that. Put shade over the busiest play structures, the toddler zone and the seating before adding another attraction, and use planting and shade sails rather than buildings so air keeps moving. Metal slides and dark rubber surfaces need particular attention, because an unshaded surface in the afternoon can be unusable regardless of how good the equipment is.

Drainage Is Not an Optional Detail

Tropical rain arrives fast and leaves slowly if the layout does not shed water. Set the falls so that each play zone drains to a defined low point, keep standing water out of landings and walkways, and design drainage before the surfacing is chosen, and check that loose fill surfacing cannot wash away into drains. A park that drains well reopens within an hour of heavy rain; one that does not may lose the whole afternoon.

Staffing and Operating Reality

Non-powered parks are cheap to run only if the operating model matches the staff you can actually employ. Two to four attendants plus a supervisor is a realistic peak team for a 1000 à 1500 square metre play area, and each zone should be visible from a staffed position. Write the routine – opening checks, zone rotation, closing inspection – because unmaintained equipment fails far more often than equipment that is used hard.

Phasing the Build for Cash Flow

Build the anchor structure and the safe surfacing first, then add the second zone, water play and food service as revenue allows. The growth path from 1000 à 5000 square metres follows the same logic we set out in our guide to scaling a non powered park, and phased sites consistently open earlier than single phase projects of the same final size.


Personnalisation

Ce que vous pouvez adapter: Mise en page, shade strategy, surfacing specification and phasing.

En direct fournisseur nous contrôlons toute la chaîne: ingénierie, production, les tests en usine et l'emballage à l'exportation ont tous lieu dans un 125,000 base de production en m², et la liste des pièces détachées suit la machine jusqu'à votre site. Les structures non motorisées sont livrées avec des données sur la hauteur de chute et des recommandations de revêtement pour chaque plate-forme et sortie de toboggan..

Envoyez votre plan de parcelle et vos préférences de revêtement – nous vous rendrons un tracé avec des hauteurs de chute, stratégie d'ombrage et liste d'équipement par étapes.