This ride was assembled and run in our factory before it was packed, which is how a fault gets found in China instead of found on opening day in Europe.
The delivery to Spain followed our standard sequence: factory test, documented packing, supervised installation and a training session on the machine.

Especificaciones clave
| Artículo | Referencia |
|---|---|
| Ubicación | España |
| Tipo de proyecto | Salto techno para un parque |
| Pruebas | Montado y ejecutado en fábrica antes del envío. |
| Entrega | Envío de contenedores con soporte de montaje. |
| Operación | Espectáculo sincronizado con música e iluminación. |
| Asientos | Modular configuration per park |
Todas las cifras son valores de referencia y están confirmados en la propuesta de ingeniería para su sitio.. Guests feel the acceleration on every bounce, which is what makes the ride feel longer than its cycle time.

Factory Testing Before Shipment
The ride was assembled at the factory, run through its full cycle and checked for restraint locking, drive behaviour, braking and control response. Lights and music were tested as a show rather than as separate systems, because that is how guests experience them. Test records and photographs were shared with the client before the container doors closed.
Packing and Shipping
Sections were crated by sub-assembly with the seating, light bars and control cabinet packed separately and clearly labelled. The loading plan put the platform parts at the doors and the finishing components behind them, matching the installation sequence. That ordering saves days on site and reduces the risk of damage to painted and moulded surfaces.
Installation and Commissioning
Erection followed the factory sequence with torque values recorded, and commissioning covered drive, brakes, restricciones, emergency stop and the audio and lighting programme. Staff were trained on start-up, loading and shutdown, with a second session for maintenance staff on the inspection routine and the common wear parts.
Operating a Music Driven Ride
A techno jump rides on its show: the lighting and music turn a bouncing machine into an event that guests watch as well as ride. Operators plan short cycles at peak times and longer cycles in quiet periods, and keep a spare lamp and connector set on site. Nuestro techno jump ride page covers the seating and show options used in projects like this one.
Personalización
Make it match your brand: Seating configuration, tematización, music and lighting programme.
Lo mismo fábrica de equipos de diversión eso construye el viaje también lo envía, lo documenta y lo respalda – 125,000 m² de espacio de producción y un paquete de documentación que los inspectores locales pueden utilizar. Barco de atracciones emocionantes con cálculos estructurales, registros de pruebas de carga y especificaciones de restricción para su archivo de inspección.
Danos el tamaño de la trama y el nivel de emoción que buscas. – Volveremos con el vehículo adecuado y lo que necesita para funcionar..










