This ride was assembled and run in our factory before it was packed, which is how a fault gets found in China instead of found on opening day in Europe.
The delivery to Spain followed our standard sequence: factory test, documented packing, supervised installation and a training session on the machine.

주요 사양
| 목 | 참조 |
|---|---|
| 위치 | Spain |
| 프로젝트 유형 | Techno jump ride for a park |
| 테스트 | Assembled and run at the factory before shipment |
| 배달 | Container shipment with assembly support |
| 작업 | Music and lighting synchronised show |
| Seating | Modular configuration per park |
모든 수치는 참조 값이며 귀하의 현장에 대한 엔지니어링 제안에서 확인되었습니다.. Guests feel the acceleration on every bounce, which is what makes the ride feel longer than its cycle time.

Factory Testing Before Shipment
The ride was assembled at the factory, run through its full cycle and checked for restraint locking, drive behaviour, braking and control response. Lights and music were tested as a show rather than as separate systems, because that is how guests experience them. Test records and photographs were shared with the client before the container doors closed.
Packing and Shipping
Sections were crated by sub-assembly with the seating, light bars and control cabinet packed separately and clearly labelled. The loading plan put the platform parts at the doors and the finishing components behind them, matching the installation sequence. That ordering saves days on site and reduces the risk of damage to painted and moulded surfaces.
Installation and Commissioning
Erection followed the factory sequence with torque values recorded, and commissioning covered drive, brakes, 구속, emergency stop and the audio and lighting programme. Staff were trained on start-up, loading and shutdown, with a second session for maintenance staff on the inspection routine and the common wear parts.
Operating a Music Driven Ride
A techno jump rides on its show: the lighting and music turn a bouncing machine into an event that guests watch as well as ride. Operators plan short cycles at peak times and longer cycles in quiet periods, and keep a spare lamp and connector set on site. 우리의 techno jump ride page covers the seating and show options used in projects like this one.
맞춤화
브랜드와 어울리게 만드세요: Seating configuration, 테마, music and lighting programme.
같은 오락 장비 공장 라이드를 만드는 사람은 배송도 해준다., 이를 문서화하고 지원합니다. – 125,000 m²의 생산 공간과 현지 검사관이 사용할 수 있는 문서 패키지. 스릴 넘치는 놀이기구에는 구조적 계산이 포함되어 있습니다., 검사 파일에 대한 하중 테스트 기록 및 구속 사양.
당신이 목표로 하는 플롯 규모와 스릴 수준을 알려주십시오. – 우리는 꼭 맞는 차량과 운행에 필요한 것을 가지고 돌아올 것입니다.