This is the kind of project where the equipment is only half the work: the park has to be planned so that construction, rides and opening sequence all line up.

The order covered a full park equipment package delivered in phases, with the ride mix chosen to serve families first and thrill seekers second.

amusement park masterplan

Mga Pangunahing Detalye

item Sanggunian
Bansa Georgia
Uri ng proyekto Full park equipment package
Contract value USD 653,000 class project
Client type Developer and park operator
Saklaw Multi-phase equipment supply and installation support
Paghahatid Multiple shipments aligned to construction

Ang lahat ng mga numero ay mga halaga ng sanggunian at nakumpirma sa panukala sa engineering para sa iyong site. Every attraction in the package is commissioned as a ride, with test records before guests board. Tingnan mo Amusement ride.

park ride mix design

Planning the Ride Mix

A park of this scale needs attractions that fill different parts of the day. The mix combined family rides that load quickly, a small number of headline thrill rides for weekend peaks, and children play equipment for the youngest visitors. That balance keeps attendance stable across weekdays instead of concentrating everything into weekends.

Phasing the Deliveries

Equipment shipped in several phases so that each zone could be completed, commissioned and opened before the next arrived. Phasing reduces storage risk, spreads cash flow and gives the operator revenue from the first zone while the rest of the park is still under construction.

Civil Works and Services

The long items are foundations, power distribution and drainage, and those were completed against our drawings before each container arrived. Where a ride needed a specific foundation or cable route, the requirement was agreed at design stage rather than discovered on site – the practical difference between opening on schedule and losing a season.

Commissioning and Handover

Each phase ended with factory-trained commissioning, load checks and operator training on the actual machines, plus documentation handed to the park’s maintenance team. Parks that follow this pattern, including the approach described in our park project process, keep control of the schedule from first drawing to opening day.


Mga Opsyon sa Tema at Tapusin

Kasama sa mga pagpipiliang partikular sa site: Ride mix, tema, phasing and delivery planning.

Gumagawa kami ng mga atraksyon sa halip na muling ibenta ang mga ito, kaya naman bumabalik ang mga teknikal na tanong bilang mga guhit sa halip na mga brochure – at bakit a 125,000 metro kuwadrado base ng produksyon maaaring sumipsip ng pagpapasadya nang hindi inililipat ang iyong petsa ng paghahatid. Kasama sa gawaing proyekto ang mga guhit ng layout, mga listahan ng mga phased na kagamitan at dokumentasyon na maaari mong ibigay diretso sa isang lokal na kontratista.

Ibigay sa amin ang mga detalye ng site at ang deadline kung saan ka nagtatrabaho – imamapa natin ang mga yugto, ang kagamitan at ang balangkas ng gastos laban dito.