This is the kind of project where the equipment is only half the work: the park has to be planned so that construction, rides and opening sequence all line up.

The order covered a full park equipment package delivered in phases, with the ride mix chosen to serve families first and thrill seekers second.

amusement park masterplan

주요 사양

목 참조
국가 Georgia
프로젝트 유형 Full park equipment package
Contract value USD 653,000 class project
Client type Developer and park operator
범위 Multi-phase equipment supply and installation support
배달 Multiple shipments aligned to construction

모든 수치는 참조 값이며 귀하의 현장에 대한 엔지니어링 제안에서 확인되었습니다.. Every attraction in the package is commissioned as a ride, with test records before guests board. 보다 Amusement ride.

park ride mix design

Planning the Ride Mix

A park of this scale needs attractions that fill different parts of the day. The mix combined family rides that load quickly, a small number of headline thrill rides for weekend peaks, and children play equipment for the youngest visitors. That balance keeps attendance stable across weekdays instead of concentrating everything into weekends.

Phasing the Deliveries

Equipment shipped in several phases so that each zone could be completed, commissioned and opened before the next arrived. Phasing reduces storage risk, spreads cash flow and gives the operator revenue from the first zone while the rest of the park is still under construction.

Civil Works and Services

The long items are foundations, power distribution and drainage, and those were completed against our drawings before each container arrived. Where a ride needed a specific foundation or cable route, the requirement was agreed at design stage rather than discovered on site – the practical difference between opening on schedule and losing a season.

Commissioning and Handover

Each phase ended with factory-trained commissioning, load checks and operator training on the actual machines, plus documentation handed to the park’s maintenance team. Parks that follow this pattern, including the approach described in our park project process, keep control of the schedule from first drawing to opening day.


테마 및 마감 옵션

사이트별 선택에는 다음이 포함됩니다.: Ride mix, 테마, phasing and delivery planning.

우리는 어트랙션을 재판매하기보다는 구축합니다., 이것이 바로 기술적인 질문이 브로셔 대신 그림으로 돌아오는 이유입니다. – 그리고 왜 125,000 square metre 생산기지 배송일을 변경하지 않고도 맞춤화를 수용할 수 있습니다.. 프로젝트 작업에는 레이아웃 도면이 포함됩니다., 현지 계약자에게 직접 전달할 수 있는 단계별 장비 목록 및 문서.

작업 중인 사이트 세부 정보와 마감일을 알려주십시오. – 우리는 단계를 매핑할 것입니다, 장비 및 이에 대한 비용 개요.