This is the kind of project where the equipment is only half the work: the park has to be planned so that construction, rides and opening sequence all line up.

The order covered a full park equipment package delivered in phases, with the ride mix chosen to serve families first and thrill seekers second.

amusement park masterplan

Pangunang Detalye

butang Reperensya
Nasud Georgia
Matang sa proyekto Full park equipment package
Contract value USD 653,000 class project
Client type Developer and park operator
Kasangkaran Multi-phase equipment supply and installation support
Paghatod Multiple shipments aligned to construction

Ang tanan nga mga numero mga reference value ug gikumpirma sa engineering proposal para sa imong site. Every attraction in the package is commissioned as a ride, with test records before guests board. Tan-awa Amusement ride.

park ride mix design

Planning the Ride Mix

A park of this scale needs attractions that fill different parts of the day. The mix combined family rides that load quickly, a small number of headline thrill rides for weekend peaks, and children play equipment for the youngest visitors. That balance keeps attendance stable across weekdays instead of concentrating everything into weekends.

Phasing the Deliveries

Equipment shipped in several phases so that each zone could be completed, commissioned and opened before the next arrived. Phasing reduces storage risk, spreads cash flow and gives the operator revenue from the first zone while the rest of the park is still under construction.

Civil Works and Services

The long items are foundations, power distribution and drainage, and those were completed against our drawings before each container arrived. Where a ride needed a specific foundation or cable route, the requirement was agreed at design stage rather than discovered on site – the practical difference between opening on schedule and losing a season.

Commissioning and Handover

Each phase ended with factory-trained commissioning, load checks and operator training on the actual machines, plus documentation handed to the park’s maintenance team. Parks that follow this pattern, including the approach described in our park project process, keep control of the schedule from first drawing to opening day.


Mga Opsyon sa Tema ug Paghuman

Ang piho nga mga kapilian sa site naglakip: Ride mix, tema, phasing and delivery planning.

Nagtukod kami og mga atraksyon imbes nga ibaligya kini, mao nga ang teknikal nga mga pangutana mibalik isip mga drowing imbes nga mga brosyur – ug ngano a 125,000 metro kwadrado base sa produksiyon makasuhop sa pag-customize nga dili ibalhin ang imong petsa sa pagpadala. Ang trabaho sa proyekto naglakip sa mga drowing sa layout, mga lista sa mga ekipo ug mga dokumentasyon nga mahimo nimong ihatag diretso sa lokal nga kontraktor.

Ihatag kanamo ang mga detalye sa site ug ang deadline nga imong gitrabahoan – atong mapa ang mga hugna, ang ekipo ug ang outline sa gasto batok niini.