Installation is a sequence, not a task. Follow it and the machine is running on schedule; skip a step and the delay appears later, usually on opening day.

This is the on site routine we run with local crews, from the first foundation survey to the handover checklist.

ride assembly on site

Mga Pangunahing Detalye

item Sanggunian
Step 1 Confirm foundations and anchor positions
Step 2 Assemble in the factory sequence
Step 3 Electrical connection and earthing
Step 4 Function and load commissioning
Step 5 Operator and maintenance training
Handover Signed checklist and documentation set

Ang lahat ng mga numero ay mga halaga ng sanggunian at nakumpirma sa panukala sa engineering para sa iyong site. Commissioning is the formal handover from installation to operation, and it ends with signed records. Tingnan mo commissioning para sa background.

ride commissioning checks

Foundations and Assembly

The first job on site is not assembly, it is verification: foundations surveyed, anchor bolts checked against the drawing, and the base line confirmed. Assembly then follows the factory sequence, with torque values recorded and photographs taken at each stage so the factory can confirm progress remotely. Local labour usually carries out the work under a factory technician’s supervision.

Electrical Connection and Earthing

Electrical work follows the schematic supplied with the machine: supply, distribution, earthing and control wiring. Earthing is not optional in a tropical site with high rainfall, and every terminal is checked before power is applied for the first time. Cable routing is planned so that it can be inspected later without dismantling the ride.

Commissioning and Load Checks

Commissioning covers start and stop sequences, emergency stops, restraint locking, brake performance, travel limits and a full operating cycle. Where the design requires load testing, it is carried out and recorded before guests board. Pag-iilaw, sound and any show programme are commissioned at the same time so the ride opens complete rather than finished later.

Training and Handover

Training happens on the machine: operators on start-up, loading, restraint checks and evacuation, and maintenance staff on the inspection routine, lubrication and wear parts. Handover ends with a signed checklist plus manuals, drawings, schematics and test records. Projects that follow this path – mula sa a park project to a single ride replacement – open on the date planned.


Mga Opsyon sa Tema at Tapusin

Gawin itong tumugma sa iyong brand: Installation model, supervision level and training scope.

Ang mga kagamitang tulad nito ay ginawa, sinubok ang pag-load at ang lalagyan ay na-load sa aming 125,000 square meter na pasilidad ng pareho tagagawa ng sakay, pagkatapos ay na-back sa mga ekstrang bahagi at teknikal na payo katagal pagkatapos ng commissioning. Kasama sa gawaing proyekto ang mga guhit ng layout, mga listahan ng mga phased na kagamitan at dokumentasyon na maaari mong ibigay diretso sa isang lokal na kontratista.

Ipadala ang iyong plot plan, hanay ng badyet at target na petsa ng pagbubukas – ibabalik namin ang isang phased proposal na maaari mong dalhin diretso sa iyong board.