Soft Play Center Package

  • Saklaw ng package: Disenyo, kagamitan, pagpapadala, suporta sa pag-install
  • Karaniwang lugar: 300 sa 800 sq m
  • Mga pangunahing kagamitan: Mga tore, mga slide, pool ng bola, toddler zone
  • Mga lugar ng suporta: Pagtanggap, cafe, party room, mga palikuran
  • Mga Materyales: Foam, vinyl at padded steel frame

Pinakabagong presyo, Mangyaring makipag -ugnay sa amin!

Opening a soft play centre is not a purchase, it is a project – and the operators who succeed treat the layout drawing as the most important document they will sign.

A package approach keeps the equipment, the building services and the operating model aligned, which is why turnkey projects open on schedule and self assembled ones do not.

soft play centre play structure

Mga Pangunahing Detalye

item Sanggunian
Saklaw ng package Disenyo, kagamitan, pagpapadala, suporta sa pag-install
Karaniwang lugar 300 sa 800 sq m
Mga pangunahing kagamitan Mga tore, mga slide, pool ng bola, toddler zone
Mga lugar ng suporta Pagtanggap, cafe, party room, mga palikuran
Mga Materyales Foam, vinyl at padded steel frame
Timeline Confirmed after design approval

Ang lahat ng mga numero ay mga halaga ng sanggunian at nakumpirma sa panukala sa engineering para sa iyong site.

indoor soft play centre package

Soft Play Centre Package Specifications

The package covers layout design for your unit, the equipment set for each age zone, shipping in containers, and installation support on site. Typical venues of 300 sa 800 square metres include a main play structure with slides and ball pool, a toddler zone, a party room and a reception with cafe. Materials are foam, reinforced vinyl and padded steel frames, and every element is detailed on the layout so lighting, power and air conditioning can be coordinated before installation.

What a Turnkey Package Should Include

A complete package answers questions the equipment list cannot: where the play structure sits relative to the entrance, how many children can be inside at once, where staff can see the whole floor, and where the cafe serves without blocking circulation. Ask for the drawing set, the bill of materials, the loading plan for containers and an installation sequence, because those documents are what your contractor will price against.

Age Zoning at Supervision

Split the floor into under fives and older children, and keep the boundary visible so parents understand it without reading a sign. Place the toddler zone next to the seating, keep the tallest slides towards the back wall, and set a maximum capacity that staff can actually monitor. Venues that also run a malambot na kagamitan sa sentro ng paglalaro upgrade later usually add a party room or a trampoline court rather than more play structure.

Safety Standards, Cleaning and Staff Routine

Padding, lambat, fall heights and entrapment gaps should all follow recognised playground safety principles such as SA 1176. Operationally, the three that matter daily are a sock or shoe policy, a logged cleaning routine for ball pools and soft surfaces, and a written check of netting, padding and fixings before opening. Keep the log where inspectors can see it, not in a drawer.

Mga Pagpipilian at Tema

Gawin itong tumugma sa iyong brand: Tema, scheme ng kulay, play structure design, laki ng toddler zone, cafe and party room fit out.

Aming 125,000 sqm production base ay sumasaklaw sa katha, paghubog, pagpupulong at pagsubok sa ilalim ng isang bubong, kaya ang pasadyang trabaho at karaniwang produksyon ay tumatakbo nang magkatabi nang hindi nakikipagkumpitensya para sa kapasidad. Ang mga panloob na instalasyon ay ipinadala na may pag-load sa sahig at mga pagsusuri sa clearance ng kisame, dahil ang dalawang numero ay nagpapasya kung ano ang maaaring i-install.

Ipadala ang floor plan at taas ng kisame – magbabalik kami ng zoning drawing na may kapasidad, listahan ng kagamitan at pagpepresyo.

Makipag -ugnay sa amin!