This is the kind of project where the equipment is only half the work: the park has to be planned so that construction, rides and opening sequence all line up.

The order covered a full park equipment package delivered in phases, with the ride mix chosen to serve families first and thrill seekers second.

amusement park masterplan

Kluczowe dane techniczne

Przedmiot Odniesienie
Kraj Georgia
Typ projektu Full park equipment package
Contract value USD 653,000 class project
Client type Developer and park operator
Zakres Multi-phase equipment supply and installation support
Dostawa Multiple shipments aligned to construction

Wszystkie liczby są wartościami referencyjnymi i zostały potwierdzone w projekcie technicznym dla Twojej lokalizacji. Every attraction in the package is commissioned as a ride, with test records before guests board. Widzieć Amusement ride.

park ride mix design

Planning the Ride Mix

A park of this scale needs attractions that fill different parts of the day. The mix combined family rides that load quickly, a small number of headline thrill rides for weekend peaks, and children play equipment for the youngest visitors. That balance keeps attendance stable across weekdays instead of concentrating everything into weekends.

Phasing the Deliveries

Equipment shipped in several phases so that each zone could be completed, commissioned and opened before the next arrived. Phasing reduces storage risk, spreads cash flow and gives the operator revenue from the first zone while the rest of the park is still under construction.

Civil Works and Services

The long items are foundations, power distribution and drainage, and those were completed against our drawings before each container arrived. Where a ride needed a specific foundation or cable route, the requirement was agreed at design stage rather than discovered on site – the practical difference between opening on schedule and losing a season.

Commissioning and Handover

Each phase ended with factory-trained commissioning, load checks and operator training on the actual machines, plus documentation handed to the park’s maintenance team. Parks that follow this pattern, including the approach described in our park project process, keep control of the schedule from first drawing to opening day.


Opcje motywu i wykończenia

Opcje specyficzne dla witryny obejmują: Ride mix, tematyczne, phasing and delivery planning.

Budujemy atrakcje, a nie je odsprzedajemy, dlatego też pytania techniczne wracają w formie rysunków, a nie broszur – i dlaczego A 125,000 metr kwadratowy baza produkcyjna może wchłonąć personalizację bez przesuwania daty dostawy. Prace projektowe obejmują rysunki układu, listy wyposażenia etapowego i dokumentację, które można przekazać bezpośrednio lokalnemu wykonawcy.

Podaj nam szczegóły miejsca i termin, w którym pracujesz – zmapujemy fazy, sprzętu i zestawienia kosztów z nim związanych.