Every hour spent testing at the factory saves a week on site, because a fault found in China costs a phone call and a fault found overseas costs a crane.

This is the sequence we run before any ride is packed, and the records the client receives before the container doors close.

ride assembly at factory

Wichtige Spezifikationen

Artikel Referenz
Bühne 1 Inspektion der Unterbaugruppe während der Fertigung
Bühne 2 Vollständige Montage im Werk
Bühne 3 Funktions- und Kontrolltests
Bühne 4 Belastungstests dort, wo das Design es erfordert
Aufzeichnungen Testblätter, Fotos und Videos
Result Faults found before shipment, not on opening day

Alle Angaben sind Richtwerte und werden im Planungsvorschlag für Ihren Standort bestätigt. Test records are the practical face of quality control, and they travel with the machine.

control system testing

From Sub Assemblies to Full Assembly

Fabrication is inspected in stages: structural welds, machining, electrical panel assembly and finish. The ride is then assembled at the factory as it will stand on site, so tolerances, clearances and interfaces are proven with the actual parts rather than on paper. Assembly photographs are taken at each stage and shared with the client.

Function, Control and Load Testing

The machine is run through its full cycle envelope: start, stoppen, Not-Aus, restraint locking, brake response, speed and travel limits. Controls are tested in every operating mode, and lighting, sound and drive systems are checked together as a show. Where the design calls for it, loads are applied and measurements recorded against the design values.

Test Records and Client Sign Off

The client receives test sheets, photographs, video of the ride running, and the electrical and mechanical documentation set. That pack is the evidence used later during commissioning and inspection, and it is the reason a defect found on site can be traced quickly to a specific assembly step rather than guessed at.

What Happens When Something Fails The Test

A test failure is a normal event, not an emergency: the part is reworked or replaced and the test repeated, with the corrected result recorded. What matters is that the failure happened before the container was loaded. The same discipline applies to every product family we build, von a techno jump ride to a full sized wheel.


Optionen und Themen

Alles Sichtbare liegt in Ihrer Hand: Test scope, documentation pack and inspection access.

Jede Einheit hinterlässt eine 125,000 Quadratmeterfabrik in China mit Testaufzeichnungen, Zeichnungen und eine Liste empfohlener Ersatzteile, Das ist, was ein Fertigungspartner überreichen und nicht nur in Rechnung stellen. Familienfahrten Schiff mit Rückhaltevorschriften, Zyklusprofile und Kapazitätszahlen für jede Konfiguration.

Senden Sie Ihren Parkplan und die Altersgruppen, die Sie bedienen möchten – Wir werden ein Layout mit Kapazität zurückgeben, Strombedarf und Preisgestaltung.