Every hour spent testing at the factory saves a week on site, because a fault found in China costs a phone call and a fault found overseas costs a crane.
This is the sequence we run before any ride is packed, and the records the client receives before the container doors close.

주요 사양
| 목 | 참조 |
|---|---|
| Stage 1 | Sub assembly inspection during fabrication |
| Stage 2 | Full assembly at the factory |
| Stage 3 | Function and control testing |
| Stage 4 | Load testing where the design requires it |
| 기록 | Test sheets, photographs and video |
| Result | Faults found before shipment, not on opening day |
모든 수치는 참조 값이며 귀하의 현장에 대한 엔지니어링 제안에서 확인되었습니다.. Test records are the practical face of quality control, and they travel with the machine.

From Sub Assemblies to Full Assembly
Fabrication is inspected in stages: structural welds, machining, electrical panel assembly and finish. The ride is then assembled at the factory as it will stand on site, so tolerances, clearances and interfaces are proven with the actual parts rather than on paper. Assembly photographs are taken at each stage and shared with the client.
Function, Control and Load Testing
The machine is run through its full cycle envelope: start, 멈추다, emergency stop, restraint locking, brake response, speed and travel limits. Controls are tested in every operating mode, and lighting, sound and drive systems are checked together as a show. Where the design calls for it, loads are applied and measurements recorded against the design values.
Test Records and Client Sign Off
The client receives test sheets, photographs, video of the ride running, and the electrical and mechanical documentation set. That pack is the evidence used later during commissioning and inspection, and it is the reason a defect found on site can be traced quickly to a specific assembly step rather than guessed at.
What Happens When Something Fails The Test
A test failure is a normal event, not an emergency: the part is reworked or replaced and the test repeated, with the corrected result recorded. What matters is that the failure happened before the container was loaded. The same discipline applies to every product family we build, 에서 테크노 점프 타기 to a full sized wheel.
옵션 및 테마
보이는 모든 것은 당신이 정의하는 것입니다: Test scope, documentation pack and inspection access.
모든 유닛은 125,000 테스트 기록이 있는 중국의 평방미터 공장, 도면 및 권장 예비 부품 목록, 그게 뭐야? 제조 파트너 단순히 청구서가 아닌 양도해야 함. 구속 사양을 갖춘 가족용 놀이기구, 각 구성의 사이클 프로필 및 용량 수치.
공원 계획과 봉사하려는 연령 그룹을 보내십시오. – 용량이 포함된 레이아웃을 반환하겠습니다., 전력 요구 사항 및 가격.