Every hour spent testing at the factory saves a week on site, because a fault found in China costs a phone call and a fault found overseas costs a crane.
This is the sequence we run before any ride is packed, and the records the client receives before the container doors close.

Spécifications clés
| Article | Référence |
|---|---|
| Stage 1 | Sub assembly inspection during fabrication |
| Stage 2 | Full assembly at the factory |
| Stage 3 | Function and control testing |
| Stage 4 | Load testing where the design requires it |
| Records | Test sheets, photographs and video |
| Result | Faults found before shipment, not on opening day |
Tous les chiffres sont des valeurs de référence et sont confirmés dans la proposition d'ingénierie de votre site. Test records are the practical face of quality control, and they travel with the machine.

From Sub Assemblies to Full Assembly
Fabrication is inspected in stages: structural welds, machining, electrical panel assembly and finish. The ride is then assembled at the factory as it will stand on site, so tolerances, clearances and interfaces are proven with the actual parts rather than on paper. Assembly photographs are taken at each stage and shared with the client.
Function, Control and Load Testing
The machine is run through its full cycle envelope: start, arrêt, emergency stop, restraint locking, brake response, speed and travel limits. Controls are tested in every operating mode, and lighting, sound and drive systems are checked together as a show. Where the design calls for it, loads are applied and measurements recorded against the design values.
Test Records and Client Sign Off
The client receives test sheets, photographs, video of the ride running, and the electrical and mechanical documentation set. That pack is the evidence used later during commissioning and inspection, and it is the reason a defect found on site can be traced quickly to a specific assembly step rather than guessed at.
What Happens When Something Fails The Test
A test failure is a normal event, not an emergency: the part is reworked or replaced and the test repeated, with the corrected result recorded. What matters is that the failure happened before the container was loaded. The same discipline applies to every product family we build, d'un saut techno to a full sized wheel.
Options et thème
Tout ce qui est visible est à vous de définir: Test scope, documentation pack and inspection access.
Chaque unité laisse un 125,000 usine de mètres carrés en Chine avec des dossiers de tests, dessins et liste de pièces de rechange recommandées, c'est quoi un partenaire de fabrication devrait remettre plutôt que simplement facturer. Les promenades en famille sont livrées avec des spécifications de retenue, profils de cycle et chiffres de capacité pour chaque configuration.
Envoyez votre plan de parc et les tranches d'âge que vous souhaitez desservir – nous vous retournerons une mise en page avec capacité, besoin en énergie et tarification.