A park project does not fail at the factory – it fails at the handover points, where a drawing, a container or an installation team moves between two parties.
This is the process we follow on every overseas project, and understanding it before you sign keeps the opening date and the budget under control.

주요 사양
| 목 | 참조 |
|---|---|
| Stage 1 | Site and market review with the client |
| Stage 2 | Concept layout and ride mix |
| Stage 3 | 인용, scope and phasing |
| Stage 4 | Production and factory testing |
| Stage 5 | Container loading and shipping |
| Stage 6 | Installation and commissioning |
| Stage 7 | 훈련, spares and after sales |
모든 수치는 참조 값이며 귀하의 현장에 대한 엔지니어링 제안에서 확인되었습니다..

Stage 1 그리고 2: Site Review and Concept Layout
Everything begins with the plot: dimensions, soil, access, 힘, water and local regulations. From that we produce a concept layout that places the entrance, walkways, ride zones and service areas, and we recommend a ride mix that fits the space and the target audience. Clients who invest time at this stage avoid the most expensive mistake in the industry, which is buying attractions that do not fit the site.
Stage 3: 인용, Scope and Phasing
A useful quotation separates equipment from civil works, 해운, installation and spare parts, because those costs fall into different budgets and different years. Agree what is included at the factory gate, what the buyer arranges locally and where responsibility changes hands. Phasing the purchase so that foundations, first rides and second phase additions arrive in a logical order is normal practice, and it is far cheaper than storing equipment.
Stage 4 그리고 5: 생산, Testing and Shipping
Production starts against approved drawings, and every ride is assembled and tested at the factory before shipment, which is where electrical and mechanical defects should be found. Container loading is planned per ride so that parts arrive in installation sequence, and packing lists are matched to the drawings. Buyers should ask for test reports, load test records and photographs before the container doors are closed – refer to containerization standards when planning cargo.
Stage 6 그리고 7: 설치, Opening and After Sales
Installation follows the sequence in the drawing set, ends with commissioning and load testing, and finishes with operator training on the actual machines rather than on a manual. After opening, the relationship continues through spare parts, technical support and scheduled inspection guidance. A supplier such as our amusement park project team should be measured on how quickly it answers in year two, not on how fast it quoted in month one.
당신이 조정할 수 있는 것
고객이 실제로 알아차리는 부분을 맞춤화합니다.: Project scope, phasing, delivery terms and installation support.
같은 오락 장비 공장 라이드를 만드는 사람은 배송도 해준다., 이를 문서화하고 지원합니다. – 125,000 평방미터의 생산 공간과 현지 검사관이 사용할 수 있는 문서 패키지. 프로젝트 작업에는 레이아웃 도면이 포함됩니다., 현지 계약자에게 직접 전달할 수 있는 단계별 장비 목록 및 문서.
작업 중인 사이트 세부 정보와 마감일을 알려주십시오. – 우리는 단계를 매핑할 것입니다, 장비 및 이에 대한 비용 개요.