School holidays and the major festive periods deliver the attendance that carries a park for the rest of the year, and they are planned months ahead.
A festive season is a product, not a decoration: the rides, the ticket, the staffing and the photo opportunities all have to be designed together.

주요 사양
| 목 | 참조 |
|---|---|
| Seasons | New Year, Eid holiday period, school breaks |
| Attractions | Themed rides, photo points, stage area |
| 설정 | Days of assembly with storage between seasons |
| 조명 | Festive LED and music programs |
| Ticketing | Event entry, bundles and group rates |
| Staffing | Peak rotas with supervision ratios |
모든 수치는 참조 값이며 귀하의 현장에 대한 엔지니어링 제안에서 확인되었습니다..

Why Festive Seasons Decide the Year
In Indonesia attendance concentrates around school holidays, the New Year period and the Eid al-Fitr holiday week, when families travel and spend on leisure. A park that plans for those weeks can earn a large share of its annual revenue in a short period – but only if capacity, staffing and ticketing are prepared for the volume.
Theming Without Rebuilding
You do not need new machines for a festive season. Existing rides can be dressed with light sets, canopies and temporary decoration, while one or two themed attractions – a Christmas or holiday themed ride such as our 크리스마스 테마 라이드 패키지 – become the photograph that markets the event. The rule is to concentrate decoration where guests already gather: the entrance, the main plaza and the ride with the longest queue.
Ticketing and Bundling for Events
Event periods support different ticketing: entry plus a bundle of rides, family packages, group rates for extended families and photo packages. Keep the offer simple enough to explain in one line at the gate, and make sure the price ladder rewards guests who stay longer. Because festive visitors are often first time guests, entry experience and signage matter more than loyalty offers during these weeks.
Staffing, Safety and Storage Between Seasons
Peak seasons multiply both attendance and risk, so rosters should be built from realistic supervision ratios rather than last year’s numbers. Brief temporary staff on ride rules and emergency procedures before they work a gate, and keep a supervisor free of a station so someone can respond without closing an attraction. Between seasons, clean decorations, store lighting and signage in labelled crates with the assembly drawings, and the next event will take days rather than weeks to build.
당신이 조정할 수 있는 것
다음 세부정보는 귀하의 공원과 일치합니다.: Event concepts, 테마, temporary attractions, lighting programs and ticketing.
그만큼 제조업체 여기 공장 자체가 있어요: 설계, 가얼 구조, 조형, 조립과 테스트는 모두 내부에서 이루어집니다. 125,000 평방미터 생산기지, 모든 장치는 포장되기 전에 부하가 걸린 상태에서 실행됩니다.. 프로젝트 작업에는 레이아웃 도면이 포함됩니다., 현지 계약자에게 직접 전달할 수 있는 단계별 장비 목록 및 문서.
플롯 계획 보내기, 예산 범위 및 목표 개시일 – 귀하가 이사회에 직접 제출할 수 있는 단계별 제안을 보내드리겠습니다..










