Building a park where the infrastructure is still developing changes the priorities: power reliability, site preparation and phasing matter more than the attraction list.

This project delivered a park in phases, starting with attractions that could run on a stable power arrangement and adding more as the site matured.

park phase one equipment

Especificações principais

Item Referência
País Nigeria
Tipo de projeto New park build
Contract value USD 266,000 class project
Escopo Equipamento, envio, suporte de instalação
Challenge Power stability and site preparation
Approach Phase the build and open one zone at a time

Todos os valores são valores de referência e estão confirmados na proposta de engenharia da sua obra. Play equipment follows established playground practice with fall heights recorded on the layout. Ver Playground.

slide complex for park

Site and Infrastructure First

Before equipment was ordered, the site was reviewed for access, drenagem, water and power. Where the grid supply was uncertain, the design allowed for generator backup sized to the ride package, and power distribution was planned so that rides could be isolated rather than shutting the whole park.

Phasing the Attraction List

Phase one concentrated on attractions with predictable power demand and low maintenance: family rides, children equipment and play installations. Thrill rides were added in later phases once the park had trading data and a maintenance team in place – a sequence that reduces risk for a first-time operator.

Installation in a Remote Setting

Remoter sites demand more planning: crane availability, housing for the installation crew, and a secure laydown area for crates. Each shipment was timed so that installation crews and equipment arrived together, and local labour was trained during the build so maintenance knowledge stayed in the country.

Operating in a Developing Market

Pricing, staffing and spares were all planned around local conditions: simple ticket models, flexible opening hours and a spares kit that covers the fastest wearing components. Parks built this way follow the same principle behind our carnival ride package faixa – buy capacity you can operate reliably today, and expand with revenue.


Opções e temas

Tudo visível é seu para definir: Mistura de passeio, phasing, power arrangements and theming.

Como um direto fornecedor nós controlamos toda a cadeia: engenharia, produção, testes de fábrica e embalagem para exportação ocorrem dentro de um 125,000 base de produção de metros quadrados, e a lista de peças de reposição segue a máquina até o seu local. O trabalho do projeto inclui desenhos de layout, listas de equipamentos e documentação em fases que você pode entregar diretamente a um empreiteiro local.

Envie seu plano de enredo, faixa de orçamento e data prevista de abertura – devolveremos uma proposta faseada que você poderá levar direto para sua diretoria.