Building a park where the infrastructure is still developing changes the priorities: power reliability, site preparation and phasing matter more than the attraction list.

This project delivered a park in phases, starting with attractions that could run on a stable power arrangement and adding more as the site matured.

park phase one equipment

주요 사양

목 참조
국가 Nigeria
프로젝트 유형 New park build
Contract value USD 266,000 class project
범위 장비, 해운, 설치 지원
Challenge Power stability and site preparation
Approach Phase the build and open one zone at a time

모든 수치는 참조 값이며 귀하의 현장에 대한 엔지니어링 제안에서 확인되었습니다.. Play equipment follows established playground practice with fall heights recorded on the layout. 보다 Playground.

slide complex for park

Site and Infrastructure First

Before equipment was ordered, the site was reviewed for access, 배수, water and power. Where the grid supply was uncertain, the design allowed for generator backup sized to the ride package, and power distribution was planned so that rides could be isolated rather than shutting the whole park.

Phasing the Attraction List

Phase one concentrated on attractions with predictable power demand and low maintenance: family rides, children equipment and play installations. Thrill rides were added in later phases once the park had trading data and a maintenance team in place – a sequence that reduces risk for a first-time operator.

Installation in a Remote Setting

Remoter sites demand more planning: crane availability, housing for the installation crew, and a secure laydown area for crates. Each shipment was timed so that installation crews and equipment arrived together, and local labour was trained during the build so maintenance knowledge stayed in the country.

Operating in a Developing Market

Pricing, staffing and spares were all planned around local conditions: simple ticket models, flexible opening hours and a spares kit that covers the fastest wearing components. Parks built this way follow the same principle behind our carnival ride package 범위 – buy capacity you can operate reliably today, and expand with revenue.


옵션 및 테마

보이는 모든 것은 당신이 정의하는 것입니다: Ride mix, phasing, power arrangements and theming.

직접적으로 공급자 우리는 전체 체인을 제어합니다: 공학, 생산, 공장 테스트 및 수출 포장은 모두 공장 내부에서 이루어집니다. 125,000 평방미터 생산기지, 예비 부품 목록은 기계를 따라 귀하의 사이트로 이동합니다.. 프로젝트 작업에는 레이아웃 도면이 포함됩니다., 현지 계약자에게 직접 전달할 수 있는 단계별 장비 목록 및 문서.

플롯 계획 보내기, 예산 범위 및 목표 개시일 – 귀하가 이사회에 직접 제출할 수 있는 단계별 제안을 보내드리겠습니다..