Building a park where the infrastructure is still developing changes the priorities: power reliability, site preparation and phasing matter more than the attraction list.

This project delivered a park in phases, starting with attractions that could run on a stable power arrangement and adding more as the site matured.

park phase one equipment

主な仕様

アイテム 参照
国 Nigeria
プロジェクトの種類 New park build
Contract value 米ドル 266,000 class project
範囲 装置, 配送, 設置サポート
Challenge Power stability and site preparation
Approach Phase the build and open one zone at a time

すべての数値は参考値であり、お客様のサイトのエンジニアリング提案で確認されます。. Play equipment follows established playground practice with fall heights recorded on the layout. See Playground.

slide complex for park

Site and Infrastructure First

Before equipment was ordered, the site was reviewed for access, 排水, water and power. Where the grid supply was uncertain, the design allowed for generator backup sized to the ride package, and power distribution was planned so that rides could be isolated rather than shutting the whole park.

Phasing the Attraction List

Phase one concentrated on attractions with predictable power demand and low maintenance: family rides, children equipment and play installations. Thrill rides were added in later phases once the park had trading data and a maintenance team in place – a sequence that reduces risk for a first-time operator.

Installation in a Remote Setting

Remoter sites demand more planning: crane availability, housing for the installation crew, and a secure laydown area for crates. Each shipment was timed so that installation crews and equipment arrived together, and local labour was trained during the build so maintenance knowledge stayed in the country.

Operating in a Developing Market

Pricing, staffing and spares were all planned around local conditions: simple ticket models, flexible opening hours and a spares kit that covers the fastest wearing components. Parks built this way follow the same principle behind our carnival ride package 範囲 – buy capacity you can operate reliably today, and expand with revenue.


オプションとテーマ

目に見えるものはすべて自分で定義できる: Ride mix, 段階的, power arrangements and theming.

直接として サプライヤー 私たちはチェーン全体を制御します: エンジニアリング, 生産, 工場でのテストと輸出梱包はすべて室内で行われます。 125,000 平方メートルの生産拠点, スペアパーツリストは機械に続いてお客様のサイトに届きます. プロジェクト作業にはレイアウト図面が含まれます, 段階的な機器リストとドキュメントを地元の請負業者に直接渡すことができます.

プロットプランを送信してください, 予算範囲と目標開業日 – 段階的な提案を返信しますので、取締役会に直接提出してください。.