The container photograph is the part clients remember, because it is the moment the project stops being a quotation and becomes equipment on the way.

This delivery to Mexico followed the same sequence we use on every tower project: crate by assembly order, load by installation order, and support the crew that puts it together.

tower ride crating and packing

Ключевые характеристики

Элемент Ссылка
Расположение Mexico
Тип проекта Family tower ride for a park
Объем Поставлять, packing, поддержка доставки и установки
Доставка Container shipment, crated by assembly order
Установка Tower assembly with gondola fitting
Сдавать Commissioning records and operator training

Все цифры являются справочными и подтверждены техническим заданием вашего объекта.. Rotating tower rides rely on центробежная сила сбалансирован приводом и подшипниковым узлом.

tower ride assembly

Packing a Tower Ride for the Sea

A tower ride travels as a set of structural sections, gondolas, drive components and electrical panels. Parts are crated by sub-assembly and numbered against the drawings, and the loading plan places the sections needed first at the container doors. Structural steel is protected for the voyage, and easily damaged items such as gondola shells travel in dedicated crates with foam separation.

Assembly on Site

Assembly begins with the foundation and anchor bolt survey, then the tower sections, the rotating structure and finally the gondolas. Torque values, bolt grades and shim positions come from the factory drawings, and we ask for photographs at each stage so the factory can confirm the work remotely. A small crane is enough for a ride of this size.

Commissioning and Safety Checks

Commissioning covers the drive and brake, rotation limits, gondola suspension, restraint locking and the emergency stop, followed by a full operating cycle under load. Guest operations start only after the checks are signed. Records from that day – electrical readings, test results and the handover checklist – become the park’s inspection file.

Running a Family Tower Ride

Samba style rides earn on steady family traffic rather than on extreme thrills, so the operating plan is about short cycles, visible capacity and evening lighting. Operators running a башня из воздушных шаров самба alongside this ride keep the two attractions on the same maintenance cycle and share one trained operator pool.


Варианты темы и отделки

Выбор для конкретного сайта включает в себя: Цвета, дизайн гондолы, освещение и тематика станции.

Каждая единица оставляет 125,000 м² на заводе в Китае с протоколами испытаний, чертежи и список рекомендуемых запасных частей., что это такое производственный партнер следует передать, а не просто выставить счет. Корабль Thrill Riders со структурными расчетами, Записи нагрузочных испытаний и спецификации ограничений для вашего файла проверки.

Отправьте план участка и ограничение высоты. – мы вернем макет с указанием безопасных зазоров, нагрузки на опоры и потребляемая мощность.